No. 23-321

Jacqueline R. Sims d/b/a JRS Staffing Services v. United States

Apr 19, 2024U.S. Court of Federal Claims
Bid protestNo topicFor government

Key Facts

Plaintiff
Jacqueline R. Sims d/b/a JRS Staffing Services
Case number
No. 23-321
Decided
Apr 19, 2024
As the opinion prints it
No. 23-321
Filed (per the opinion)
Apr 18, 2024 (the opinion's own filing line, kept beside the listing's date)

Matter

Bid protest

Matter is contract dispute, bid protest, or both. For a decision read from the curated listing it is the listing's own arrangement; for a decision read from the court's own feed it is the court's Nature of Suit where the official record holds one, and otherwise what the opinion's own opening states. Where the official record is available, the court's own Nature of Suit appears beside it.

Topics

No topic

Topics are an editorial grouping of the decisions read from the curated listing, not a classification by the court. A decision listed under several topics carries all of them. Bid protests carry no topic at all, and neither does a decision read from the court's own feed: no grouping was published for them.

Appearances

For plaintiff
Jacqueline Sims
Appearing pro se
For the United States
Daniel Bertoni
United States Department of Justice
Washington, DC
Opinion PDF (uscourts.gov) U.S. Court of Federal Claims opinions and ordersThe opinion document is hosted by the U.S. Court of Federal Claims itself, so it is an official copy, and the court's own opinions page is the source of record. The outcome, topics and appearances above are derived deterministically from the court's record and the opinion's own text.

Research This Decision

Create a free account to open this decision in the COFC workspace: the Decision Brief workflow, the filtered browser and the outcome insights over the whole corpus.

COFC Decision Brief

A Workflows Hub brief drafted from this opinion's own text and the authorities it cites, with every citation traced back to the page it came from.

Browse and Insights

The court's opinions filtered by matter, topic, judge, outcome and year, with the outcome dashboard whose every rate divides by merits rulings.

Full Opinion

Full text of the opinion9 pages, 23,835 characters, read from the court's own documentFiled Apr 18, 2024 Decision documentOfficial source: U.S. Court of Federal Claims opinions and ordersThe document states: No. 23-321

Authorities cited

9 authorities read from this opinion's own text, grouped by the body of law each comes from. 8 open at a publisher or in this app; the rest are shown without a link because no published page for them was confirmed.

Contract Disputes Act1
Tucker Act and the Judicial Code2
Administrative Procedure Act2

4 more in 2 further groups.

Read from the opinion's own words with no model involved. Statutes, regulations, the acts these forums argue by name, and cases at the board, this office or the Comptroller General are recognized; any other citation form is left out rather than guessed at, so this is a floor on what the opinion cites.

Cases cited

5 cases this opinion cites, grouped by the forum that decided each, in the order it first names them. 5 of them open at a publisher.

Read from the opinion's own words with no model involved: the party names and the citation are as the opinion prints them. A case cited to a reporter is not held here, so where it opens was confirmed one citation at a time against an outside database and is labelled as leaving this app; a citation that database could not place, or matched to more than one case, is shown without a link rather than guessed at. A case named without a citation of any kind carries nothing to read, so it is left out rather than guessed at, and this is a floor on what the opinion cites.

For the plaintiff
Jacqueline Sims
Appeared without counsel.
As the opinion writes it

Jacqueline Sims, pro se, for plaintiff.

For the government
Daniel Bertoni
United States Department of Justice
Washington, DC
As the opinion writes it

Daniel Bertoni, U.S. Department of Justice, Civil Division, Washington, DC, for defendant.

Jacqueline Sims, pro se, for plaintiff.

Daniel Bertoni, U.S. Department of Justice, Civil Division, Washington, DC, for defendant.

Opinion and Order

SMITH, Senior Judge

This pre-award protest comes before the Court on the parties’ Cross-Motions for Judgment on the Administrative Record. Plaintiff Jacqueline R. Sims, an individual and sole proprietor doing business as “JRS Staffing Services,” challenges the terms of Request for Quotation No. 15BFA022Q00000086 (the “Solicitation”) issued by the Federal Bureau of Prisons (the “Agency”) to solicit spiritual services for the Life Connections Program at the Federal Medical Center, Carswell. See generally Second Amended Complaint, ECF No. 19 [hereinafter Second Am. Compl.]. Specifically, plaintiff challenges the Solicitation’s process, or lack thereof, for notifying contractors in the event that their employees failed credit screening by the Agency. Id. at 9–19. In response, defendant, the United States of America, argues that the Agency adequately described rational procedures for evaluating employees’ credit reports. See generally, Defendant’s Third Motion to Dismiss and Motion for Judgment on the Administrative Record, ECF No. 25 [hereinafter Def.’s MJAR].

The Court, for the reasons set forth below, agrees with defendant. Accordingly, the Court grants defendant’s Motion for Judgment on the Administrative Record and denies plaintiff’s Cross-Motion for Judgment on the Administrative Record. Because defendant’s dispositive motion is granted, Defendant’s Motion to Dismiss is found as moot.

In the United States Court of Federal Claims No. 23-321

Filed: April 18, 2024

JACQUELINE R. SIMS

D/B/A JRS STAFFING SERVICES,

Plaintiff,

v.

THE UNITED STATES,

Defendant.

)

)

)

)

)

)

)

)

)

)

)

I. Background

A. The Solicitation for Spiritual Guides at Federal Medical Center, Carswell

On May 11, 2022, the Agency initiated market research to acquire the services of three on-site Spiritual Guides for the Life Connections Program (“LCP”) at the Federal Medical Center, Carswell (“FMC”), an administrative security federal medical center in Fort Worth, Texas. See Administrative Record at 1–8, ECF No. 22-2 [hereinafter AR]. After the Agency posted a Sources Sought Notice on SAM.gov—with both a Statement of Work and a Market Research Questionnaire for interested parties to complete and return—it received three responses, including one from plaintiff. Id. at 1–3, 11–30. On July 7, 2022, relying in part on these responses, the Agency produced a market research report concluding that the required Spiritual Guide services were commercially available. Id. at 32–34.

On July 13, 2022, the Agency posted the Solicitation seeking procurement of LCP Spiritual Guides. Id. at 35–37. Any resulting contract from the Solicitation would be a single-award, indefinite-delivery contract with firm-fixed pricing. Id. at 44. The contract would be awarded to the offeror whose quotation presented “the best value to the Government considering the price and past performance history.” Id. at 71. The Agency estimated that it would make its award decision by August 2022. Id. The contract would commence around October 1, 2022, with a one-year period of performance and four one-year option periods. Id. According to the Solicitation, the Spiritual Guides would be in “frequent and unsupervised contact” with inmates, including thirty hours per week of classroom instruction and/or interactive sessions. Id. The Agency would therefore screen these Spiritual Guides “for security related matters,” which included requiring the contract awardee to complete numerous investigative processes and procedures—like a credit check—before “any Contractor employees [we]re permitted inside [FMC].” Id. at 45, 164, 167–8. The Agency specifically highlighted the “require[ment] that contractor personnel have a ‘favorable credit report,’” going as far as to “strongly encourage[] [quoters] to pre-screen potential candidates for credit issues before submitting the candidate to FMC Carswell.” Id. at 45 (emphasis in original). Quotations were originally due on or before August 11, 2022. Id. at 38. Plaintiff sent two emails—one on August 3, 2022, and a second on August 8, 2022—to the Agency with questions regarding whether there was an incumbent contractor, and the insurance requirements for contractors. Id. at 90–95. Dissatisfied with the Agency’s responses, see id., plaintiff filed an agency-level protest on the same day that quotations were due, id. at 96.

B. Procedural History

1. Agency-Level Protest

On August 11, 2022, plaintiff protested the Solicitation before the Agency, challenging numerous aspects of the procurement including: the proof of insurance requirement; the timeline for completing security requirements; and the Solicitation’s inclusion contract clause DOJ-03 Personnel Security Requirements for Contractor Employees (Nov. 2021) (“DOJ-03”) in the awarded contract. Id. at 96–121. Relevant here, plaintiff asserted that neither the DOJ-03 clause nor the Solicitation defined what “constitutes a favorable credit report.” Id. at 116 On February 9, 2023, the Agency issued a decision sustaining plaintiff’s protest in part and denying it in part. Id. at 132–41. The Agency agreed with plaintiff that the Solicitation’s requirement for proof of insurance at the time of quote submission was ambiguous, and amended the Solicitation to make proof of insurance due after the contract award. Id. at 134. But the Agency denied plaintiff’s protest as to two other grounds—the timeline for completing security requirements, and the inclusion of the DOJ-03 clause—after finding a rational basis for these requirements. Id. at 135–41.

On February 14, 2023, plaintiff requested reconsideration of the Agency’s decision to keep the Solicitation’s DOJ-03 clause. Id. at 142. On March 3, 2023, the Agency relented: It eliminated the DOJ-03 clause when it issued Solicitation Amendment No. 15BFA022Q00000086-0001 (“Amendment 1”). On April 5, 2023, it informed plaintiff of its decision to remove the DOJ-03 clause. Id. at 158–60.

2. Plaintiff’s First Complaint

On March 6, 2023, plaintiff filed a pre-award bid protest with this Court, challenging the inclusion of the DOJ-03 clause in the original Solicitation. Complaint at 1, ECF No. 1. [hereinafter Compl.]. On March 24, 2023, defendant filed a Motion to Dismiss arguing that Amendment 1, which eliminated the DOJ-03 clause, rendered plaintiff’s claims moot.

Defendant’s First Motion to Dismiss at 1, ECF No. 10 [hereinafter Def.’s First Mot. to Dismiss].

3. Plaintiff’s Amended Complaint

Almost simultaneously with defendant’s First Motion to Dismiss, plaintiff filed an Amended Complaint that dropped all claims regarding the DOJ-03 clause and raised three new claims alleging that: (1) plaintiff is entitled to a formal decision by the Agency on her request for reconsideration; (2) Amendment 1 is unclear regarding whether a credit check of contract staff is required and what constitutes a favorable credit check; and (3) Amendment 1 is ambiguous concerning the dates of performance and the expected quantity of hours. First Amended Complaint at 17, 21, 25, ECF No. 11 [hereinafter First Am. Compl.].

Then, on April 3, 2023, the Agency issued a Notice of Corrective Action, outlining the Agency’s intent to file Amendment No. 15BFA022Q00000086-0002 (“Amendment 2”) to the Solicitation, extending the quotation due date to April 17, 2023. See Defendant’s Notice of Corrective Action at 1, EFC No. 12 [hereinafter Def.’s Not. of Corrective Action]. Shortly thereafter, the Agency initiated three more substantive Solicitation amendments:

•Amendment No. 15BFA022Q00000086-0003 (“Amendment 3”) on April 5, 2023;
•Amendment No. 15BFA022Q00000086-0004 (“Amendment 4”) on April 20, 2023; and
•Amendment No. 15BFA022Q00000086-0005 (“Amendment 5”) on May 2, 2023.
Table as printed on page 4 of the court's own document, set from where the page puts its cells rather than from the text layer, which prints one cell per line. The words are the document's and nothing is totalled or interpreted. The page sets no heading apart on this one, so none is shown; a table that runs on from the previous page begins mid-data.

AR 163, 166–67. Important to the instant protest, Amendment 3 clarified that the Agency would “conduct a credit review on contractor staff as part of standard procedure” post-award. Id. Amendment 4 explained that the Agency would evaluate “credit reports individually with attention to the needs and concerns of the particular institution.” Id. at 166. Amendment 5 provided specifics on the credit review process by adding language clarifying that the Agency “evaluates credit reports within its sole discretion and on a case-by-case basis” and is not subject to bright-line rules given the concern for safety and security. Id. at 167. Amendment 5 also included the following language:

[The Agency] conducts credit reviews of contractor staff as part of its standard procedure. [The Agency] evaluates credit reports within its sole discretion on a case-by-case basis, with a goal of ensuring the safety of all individuals within, and the security of, [Agency] facilities. The credit review process requires the exercise of [the Agency’s] judgment on matters of safety and security and is not susceptible to bright-line rules. When [the Agency’s] review of a credit report reveals derogatory information, such as past-due debt, delinquency, bankruptcy, or default, that derogatory information normally must be resolved before a contractor staff’s credit report will be deemed acceptable. Depending on the circumstances, resolution of derogatory information may require that the contractor staff provide pertinent evidence, such as, in the case of a past-due debt, a statement of the reason for a past-due debt, documentation showing a debt is disputed, documentation showing full payment of a debt, and/or documentation establishing a payment plan. Absent a resolution of derogatory information, a contractor staff’s credit report normally will not be deemed acceptable by [the Agency].

Id.

On May 5, 2023, defendant filed a second Motion to Dismiss, arguing that Amendments 3, 4 and 5 mooted plaintiff’s claims in her First Amended Complaint. See Defendant’s Second Motion to Dismiss at 1, ECF No. 14 [hereinafter Def.’s Second Mot. to Dismiss].

4. Plaintiff’s Second Amended Complaint

On May 15, 2023, the Court granted plaintiff’s Motion for Leave to file a Second Amended Complaint. See Plaintiff’s Unopposed Motion for Leave to Amend Complaint, ECF No. 15; Order Granting Plaintiff’s Unopposed Motion for Leave to Amend Complaint, ECF No. 16. To account for this ongoing litigation, defendant issued Solicitation Amendment No. 15BFA022Q00000086-0006 (“Amendment 6”) on May 24, 2023, extending the Solicitation’s due date for quotations to September 1, 2023. AR 168.

On May 31, 2023, plaintiff filed her Second Amended Complaint. See Second Am.

Compl. at 1. On June 6, 2023, defendant filed an unopposed Motion to Withdraw its earlier Motions to Dismiss. See Defendant’s Consent Motion to Withdraw Motions to Dismiss at 1, ECF No. 21.

On June 23, 2023, defendant filed a third Motion to Dismiss, or in the alternative, Motion for Judgment on the Administrative Record. See Def.’s MJAR at 1. On July 14, 2023, plaintiff filed her response to defendant’s Motion to Dismiss and Cross-Motion for Judgment on the Administrative Record. See Plaintiff’s Response and Cross-Motion for Judgment on the Administrative Record at 1, ECF No. 31 [hereinafter Pl.’s CMJAR]. On July 21, 2023, defendant filed its response and reply. See Defendant’s Response to Plaintiff’s Cross-Motion for Judgment on the Administrative Record and Reply in support of its Motion to Dismiss, ECF No. 33 [hereinafter Def.’s Reply]. On July 31, 2023, plaintiff filed a Reply in support of its Cross-Motion for Judgment on the Administrative Record. See Plaintiff’s Reply to Response Motion, ECF No. 36 [hereinafter Pl.’s Reply]; see also ECF No. 38 (duplicative of ECF No. 36).

Also on July 31, 2023, plaintiff moved for leave to file a declaration addressing harm suffered. See Plaintiff’s Motion for Leave to File Declaration, ECF No. 37. On August 14, 2023, defendant filed a response to plaintiff’s Motion, objecting to portions of the declaration that spoke to the merits of plaintiff’s protest. See Defendant’s Response to Plaintiff’s Motion for Leave to File Declaration, ECF No. 39. On August 21, 2023, plaintiff filed a reply. See Plaintiff’s Reply to its Motion for Leave to File Declaration, ECF No. 41.

II. Standard of Review

A. Bid Protests

The Tucker Act grants this Court jurisdiction over bid protest actions. 28 U.S.C. § 1491(b)(1). The Court has “jurisdiction to entertain such an action without regard to whether suit is instituted before or after the contract is awarded.” Id. Reviewing such actions under the Administrative Procedure Act (“APA”), this Court shall “hold unlawful and set aside agency action, findings, and conclusions found to be arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” See Bannum v. United States, 404 F.3d 1346, 1351 (Fed. Cir. 2005) (citing 5 U.S.C. § 706(2)(A)). In the bid protest context, the Court will set aside agency action if “either (1) the procurement official’s decision lacked a rational basis; or (2) the procurement procedure involved a violation of regulation or procedure.” See Impresa Construzioni Geom. Domenico Gurufi v. United States, 238 F.3d 1324, 1332 (Fed. Cir. 2001).

B. Motions for Judgment on the Administrative Record

A party may move for judgment on the administrative record, requesting that the Court assess “whether the administrative body, given all disputed and undisputed facts appearing in the record, acted in a manner that complied with the legal standards governing the decision under review” pursuant to RCFC 52.1. See Supreme Foodservice GmbH v. United States, 109 Fed. Cl. 369, 382 (2013). On such a motion, the parties are limited to the administrative record, and the Court must make findings of fact as if it were conducting a trial on a paper record. R. Ct. Fed. Cl. 52.1; Bannum, 404 F.3d at 1354. The Court will then determine whether a party has met its burden of proof based on the evidence in the record. See Bannum, 404 F.3d at 1355.

III. Discussion

This case, at its heart, concerns a single question: Did the Agency’s Solicitation credit check requirement comply with regulatory requirements?

Defendant argues that the Agency complied with regulatory requirements because the Solicitation “provides all material terms of the services sought, explains how to submit quotations, and states how quotations will be evaluated.” Def.’s MJAR at 20 (citing AR 43– 46, 71). Defendant states that the Solicitation offers “‘sufficient detail’ to permit offerors to compete intelligently and on a relatively equal basis,” a standard extracted from the Federal Acquisition Regulation (“FAR”) and oft enumerated in case law. Id. at 19–20. Defendant also asserts that the Agency’s credit check requirement reasonably shifts risk to the offeror as a special contract condition. Id. at 22.

Plaintiff’s response is chiefly concerned with the Agency’s credit check requirement. To her, the Solicitation violates FAR 11.002 and FAR 12.202—which govern the Agency’s description of its needs—because the Solicitation “lacks sufficient information about material credit report requirements,” and is “silent as to whether the [c]ontractor will be notified if the credit report of its employee contains derogatory [information].” Pl.’s CMJAR at 31–32. Plaintiff argues that the Agency is irrationally “withhold[ing] the best available information about the scope of the agency’s notification process (when a credit report contains derogatory information that must be resolved)” and withholding guidelines used to evaluate credit reports prevented plaintiff from performing her duties properly. Id. at 30–36.

Here, the record illustrates that the Agency’s Solicitation and its requirements meet the standards prescribed by FAR Part 11 and Part 12. Accordingly, plaintiff has failed to meet its burden of showing a clear and prejudicial violation of the regulation. Impresa Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324, 1332–33 (Fed. Cir. 2001).

FAR Part 11 implements statutory requirements for planning and solicitation development in the federal procurement process. 41 U.S.C. §§ 3306(a), 3307. Its requirements are simple but nonetheless crucial: FAR 11.002 requires agencies to clearly define their acquisition needs—such as specifying needs using “market research,” FAR 11.002(a)(1); stating requirements with the performance required, see FAR 11.002(a)(2)(i)(B); and promoting requirements that “enable and encourage” offerors to supply commercial items and services, FAR 11.002(a)(2)(ii).

In line with FAR 11.002, the Agency identified its need—Life Connections Program’s Spiritual Guides services—and conducted market research to determine the necessary performance required and the availability of these services in the commercial marketplace. Specifically, the Agency developed a Statement of Work that detailed the work to be performed, such as inmate management, security requirements, and mandatory training, as part of the Sources Sought Notice. AR 9–10. Then, the Agency conducted market research by contacting recommended vendors and soliciting market capabilities from industry—which plaintiff responded to as illustrated by her completed Market Research Questionnaire. AR 11– 16, 32–34. In the Agency’s Market Research Report, the Agency documented the history of this requirement, the market research conducted, and the Agency’s final findings, including the determination that the Agency’s need was “available on the commercial market” such that “the procurement will be conducted using FAR Part 12.” AR 32–34. No more, despite plaintiff’s contrary hopes, is required.

Building off Part 11, FAR Part 12 implements statutory requirements for simplified acquisition procedures of commercial items and services. 41 U.S.C. §§ 1906, 1907, 3307. Under this framework, market research is the touchstone for defining an agency’s needs, the related solicitation’s terms, as well as developing “sufficient” descriptive “detail” to solicit potential offerors with suitable commercial items and services. Therefore, “[m]arket research . . . establishes the foundation for the agency description of need (see part 11), the solicitation, and resulting contract.” See FAR 12.202(a) (emphasis added).

The same facts that satisfy FAR Part 11 meet the market research threshold in FAR 12.202. Additionally, the Solicitation sufficiently details the Agency’s needs such that offerors know which commercial services are suitable and the related requirements for service, including the credit check requirement. The Solicitation listed several investigative processes and procedures that contractor employees must satisfy before entering a correctional institution, including a credit check, and it included the following notice to offerors regarding credit reports:

Quoters should also note that contract clause 52.24-403-70, Notice of Contractor Personnel Security Requirements (Oct 2005) requires that contractor personnel have a “favorable credit report.” Quoters are strongly encouraged to pre-screen potential candidates for credit issues before submitting the candidate to FMC Carswell.

AR 45 (emphasis in original). To be sure, plaintiff is not challenging the inclusion of the credit report requirement in the Solicitation, but rather takes issue with the Agency’s notification process and disclosure guidelines for an acceptable credit check. To this point, Agency amended the Solicitation not once—but twice—to provide offerors more information regarding the credit report procedures:

BOP evaluates credit reports individually with attention to the needs and concerns of the particular institution. If a review of a credit report turns up issues BOP deems of concern, BOP will notify the contracting officer to resolve the concerns.
AR 166 (Amendment 0004).
BOP conducts credit reviews of contractor staff as part of its standard procedure. BOP evaluates credit reports within its sole discretion on a case-by-case basis, with a goal of ensuring the safety of all individuals within, and the security of, BOP facilities. The credit review process requires the exercise of BOP’s judgment on matters of safety and security and is not susceptible to bright-line rules. When BOP’s review of a credit report reveals derogatory information, such as past-due debt, delinquency, bankruptcy, or default, that derogatory information normally must be resolved before a contractor staff’s credit report will be deemed acceptable. Depending on the circumstances, resolution of derogatory information may require that the contractor staff provide pertinent evidence, such as, in the case of a past-due debt, a statement of the reason for a past-due debt, documentation showing a debt is disputed, documentation showing full payment of a debt, and/or documentation establishing a payment plan. Absent a resolution of derogatory information, a contractor staff’s credit report normally will not be deemed acceptable by BOP.
AR 167 (Amendment 5).
These amendments resolve any credit report issues; the revisions expressly detail the

procedure surrounding derogatory credit reports. AR 167. Plaintiff’s insistence otherwise thus belies reality. Pl.’s CMJAR at 32 (claiming that Agency’s Solicitation “lack sufficient information” because “the Contractor will [not] be notified if the [Agency] deems that a Contractor employee’s credit report contains derogatory information that must be resolved.”). If plaintiff is concerned that an individual employee may not pass a credit check, she could pre-screen employees credit reports to ensure that they pass, as recommended in the Solicitation. See AR 45. Granted, it is possible that plaintiff’s pre-screening efforts may fail. But her concerns that she may not be notified of an employee’s derogatory credit report, should such circumstances arise, cannot be reviewed now because that issue is a matter of contract administration, which plaintiff expressly recognizes. Pl.’s CMJAR at 32 (“Here, even though the credit check requirements would take place post-award if the awardee is a company . . .”); see Kellogg Brown & Root Servs., Inc. v. United States, 117 Fed. Cl. 764, 770 (2014) (finding questions of contract administration must be brought under the Contract Disputes Act and not within the Court’s bid protest jurisdiction under the Tucker Act). In sum, plaintiff has not established a clear and prejudicial violation of FAR 11.002 and FAR 12.202, and therefore, the Court denies her claims.

The Court concludes that plaintiff has not succeeded on the merits of either of her claims. The Court, therefore, need not address plaintiff’s remaining requests for relief, namely plaintiff’s request for a permanent injunction and monetary relief in the form of bid and proposal costs. See Compl. at 19–20; FirstLine Transp. Sec., Inc. v. United States, 119 Fed. CL. 116, 127 (2014) (explaining that, of the four factors considered when assessing permanent injunctive relief, “[s]uccess on the merits is the most important factor”); E.W. Bliss Co. v. United States, 77 F.3d 445, 447 (Fed. Cir. 1996) (“[A] losing competitor may recover the costs of preparing its unsuccessful proposal if it can establish that the Government’s consideration of the proposals submitted was arbitrary or capricious”).

IV. Conclusion

For the reasons above, defendant’s MOTION for Judgment on the Administrative Record, ECF No. 25, is hereby GRANTED. Plaintiff’s CROSS-MOTION for Judgment on the Administrative Record, ECF No. 31, is hereby DENIED. Because defendant’s dispositive MOTION for Judgment on the Administrative Record is granted, defendant’s other outstanding MOTIONS regarding dismissal, ECF Nos. 10, 14, 21, and plaintiff’s MOTION for Leave to File Declaration, ECF No. 37, are FOUND AS MOOT. The Clerk of Court is directed to enter judgment accordingly.

IT IS SO ORDERED.

s/ Loren A. Smith

Loren A. Smith,

Senior Judge

This is a verbatim capture of the text layer of the court's own document in Jacqueline R. Sims d/b/a JRS Staffing Services v. United States. Nothing is summarized or reworded, and the sections run in the order the court wrote them. Two things the page shows are not repeated in the text: the rule the court draws around its caption, and the pagination furniture (the page numbers and the electronic filing stamp printed across the top of each page).

Related Decisions

Same Matter: Bid protest

Same Year

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.