B-405409

RMI

Oct 20, 2011.Defense Logistics AgencyDepartment of War
Dismissed

GAO Digest

RMI, of Stafford Springs, Connecticut, protests its status as an approved dealer/distributor with respect to request for quotations (RFQ) No. SPM4A7-11-Q-9115 issued by the Defense Logistics Agency (DLA) for a compressor shroud segment for the F-108 engine. RMI complains that it should be approved as a manufacturer of the shroud segment. We dismiss the protest as failing to state a valid basis of protest. We dismiss the protest as failing to state a valid basis of protest.

Key Facts

Decision date
Oct 20, 2011.
Publicly released
Oct 20, 2011.
Agency
Defense Logistics Agency
Department
Department of War

Formerly the Department of Defense

Decided by
Lynn H. Gibson, General Counsel

Counsel

Protester
Mark S. Jewson
Agency
Defense Logistics Agency
Michael P. Chiffolo
GAO
Office of the General Counsel, GAO
Paula J. Haurilesko, Guy R. Pietrovito

Procurement

Solicitation
SPM4A7-11-Q-9115 (RFQ)
Instrument
Contract
View on GAO.gov Decision PDFThe outcome, grounds and appearances above are derived deterministically from GAO's published text. The decision on GAO.gov is the source of record.

Research This Decision

Create a free account to open this decision in the GAO Protest workspace: semantic search for similar protests, the citation graph, and the research agent over the whole corpus.

Similar Decisions

Protests that read like this one, ranked by the decision text across the whole corpus rather than by keyword.

Citation Graph

This decision's cited authorities, agency and related protests as an interactive knowledge graph.

Full Decision

Full text of the decision9,664 characters, captured from GAO's own published text Decision PDFOfficial source: GAO.gov

Authorities cited

1 authority read from this decision's own text, grouped by the body of law each comes from. Select one to read it at its publisher.

Competition in Contracting Act1

Read from the decision's own words with no model involved. Statutes, regulations, the acts these forums argue by name, and cases at the board, this office or the Comptroller General are recognized; any other citation form is left out rather than guessed at, so this is a floor on what the decision cites.

Cases cited

6 cases this decision cites, in the order it first names them. 1 of them opens in this app; the rest are shown without a link because no published copy of them was confirmed.

Classic Mfg.B-249776Aircraft Co., Inc.B-222565B-222565B-222566Diesel Energy Sys. Co.B-213428.2Missouri Machinery & Eng'g Co.B-403561New SI, LLCB-295209

Read from the decision's own words with no model involved: the party names and the citation are as the decision prints them. A case named without a citation of any kind carries nothing to read, so it is left out rather than guessed at, and this is a floor on what the decision cites.

Highlights

RMI, of Stafford Springs, Connecticut, protests its status as an approved dealer/distributor with respect to request for quotations (RFQ) No. SPM4A7-11-Q-9115 issued by the Defense Logistics Agency (DLA) for a compressor shroud segment for the F-108 engine. RMI complains that it should be approved as a manufacturer of the shroud segment. We dismiss the protest as failing to state a valid basis of protest.

Decision

Matter of: RMI

File: B-405409

Date: October 20, 2011

Mark S. Jewson for the protester.

Michael P. Chiffolo, Esq., Defense Logistics Agency, for the agency.

Paula J. Haurilesko, Esq., and Guy R. Pietrovito, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision.

DIGEST

Protest that the agency improperly approved the protester as an authorized dealer/distributor rather than as a manufacturer of a critical application item that requires source approval fails to state a valid basis for protest where the protester is qualified to compete for contract award.

DECISION

RMI, of Stafford Springs, Connecticut, protests its status as an approved dealer/distributor with respect to request for quotations (RFQ) No. SPM4A7-11-Q-9115 issued by the Defense Logistics Agency (DLA) for a compressor shroud segment for the F-108 engine. RMI complains that it should be approved as a manufacturer of the shroud segment.

We dismiss the protest as failing to state a valid basis of protest.

BACKGROUND

The RFQ, issued on July 20, 2011, seeks F-108 engine shroud segments, national stock number (NSN) 2840-01-263-3318. Offerors were advised that the engine shroud segment is a critical application item which requires source approval. In this regard, the RFQ identified three companies, ADOM Engineering, Inc., CFM International, Inc., and General Electric Company as approved sources to provide this part, and instructed offerors seeking source approval to provide supporting documentation and certifications. RFQ at 3, 6.

The RFQ and other documents provided by DLA variously indicate--often in the same document--that the engine shroud segment is a critical safety item and a critical application item. In a telephone hearing conducted by our Office, one of the engineers responsible for approving sources confirmed that the part is a critical application item--meaning here that the item is essential to the performance or operation of the engine, or the preservation of life or safety of operating personnel.

Various types of entities may receive source approval to supply critical application items. For example, source approval may be given to system or subsystem prime contractors, actual manufacturers (i.e., original equipment manufacturers (OEM) that supply items to the prime contractor where the prime contractor provides no value added), fully'licensed manufacturers (companies making the part under a licensing agreement with the prime contractor or OEM), distributors that provide items made by other approved sources, and alternate sources such as companies that hold parts manufacturing approvals (PMA) from the Federal Aviation Administration (FAA). Agency Reply to Protester's Comments, Sept. 14, 2011, Tab 3, Aviation Source Approval and Management Handbook sect. 1.1. As relevant here, a PMA holder cannot automatically receive source approval to supply parts for military use, but must instead apply for source approval from the design control activity. See id. sect. 1.10.

Each military service has a design control activity which evaluates potential sources for critical application and critical safety items. The Air Force design control activity for the F-108 engine is responsible for reviewing RMI's request for source approval.

A PMA is a combined design and production approval bestowed by the FAA for modification and replacement aircraft parts for civil aircraft. See RMI Comments, Tab 8.2, FAA Order 8110.42C, Ch. 1 at 1. The FAA considers the producer of a part to be a person who participates significantly in at least one of several activities, such as fabricating or treating the part, performing a value-added part inspection, or controlling or supervising the manufacture of the part. Id., Tab 8.3, FAA Order 8110.42C, at M-2.

Prior to the issuance of the RFQ, RMI, a PMA holder, submitted a source approval request to DLA for the engine shroud segment. DLA forwarded RMI's request to the Air Force's design control activity for the F-108 engine for review, and in August 2010 the design control activity conducted a site survey of RMI's facilities. The Air Force concluded that RMI did not have production facilities and therefore could not be approved as an actual manufacturer of the part. Agency Report (AR), Tab 8, Air Force Memorandum for DLA, Oct. 1, 2010. Instead, the Air Force determined that RMI could be approved as a dealer/distributor for ADOM Engineering, an approved source for the part, if RMI provided additional information. AR, Tab 7, Air Force Memorandum for RMI, Jan. 5, 2011, at 1. RMI provided the information, and in June 2011, RMI was approved as an authorized distributor to ADOM, the approved source.

As a dealer/distributor, RMI is required to buy the shroud segment from the approved source, in this case, ADOM Engineering.

After the RFQ was issued, RMI filed this protest.

DISCUSSION

RMI raises multiple arguments objecting to the agency's designation of RMI as an approved dealer/distributor. The crux of RMI's arguments is that the Air Force erroneously concluded that RMI is not a manufacturer of the engine shroud segment. RMI does not contend, however, that the approval requirement is unnecessary or that RMI will not be permitted to compete under the RFQ. In this regard, RMI has not identified any provision in the solicitation that prevents it from competing on an equal basis with other approved sources.

For example, RMI complains that other companies that use subcontractors have received source approval as manufacturers and suggests that GAO investigate the qualifications of other companies that have received source approval. See Comments, Parts 2, 8. However, our Office does not conduct investigations as part of our bid protest function. New SI, LLC, B-295209, et al., Nov. 22, 2004, 2005 CPD para. 71 at 3.

The Competition in Contracting Act of 1984 requires agencies to obtain full and open competition in their procurements through the use of competitive procedures. 10 U.S.C. sect. 2304(a)(1) (2006). Accordingly, when an agency restricts contract award to an approved source, it must give nonapproved sources a reasonable opportunity to qualify. 10 U.S.C. sect. 2319(c)(3); Classic Mfg., B-249776, Dec. 14, 1992, 92-2 CPD para. 412 at 4. Our role in resolving bid protests is to ensure that the statutory requirements for full and open competition are met. Pacific Photocopy and Research Servs., B'278698, B'278698.3, Mar. 4, 1998, 98-1 CPD para. 69 at 4. Thus, in the context of complaints regarding the qualification of parts or supplies, we will review challenges that impact a federal agency's competition under a procurement, such as whether the agency has a reasonable need for a qualification requirement, see B.H. Aircraft Co., Inc., B-222565, B-222566, Aug. 4, 1986, 86-2 CPD para. 143, or whether an agency has presented an offeror with a reasonable opportunity to qualify its parts or to become approved. See Classic Mfg., supra.

Here, RMI has not demonstrated that it has been restricted from competing by the agency's actions. During a telephonic hearing we conducted with regard to this protest, the Air Force confirmed that, as an approved dealer/distributor, RMI may compete under the RFQ on an equal basis with other types of approved sources. See Audio Recording, File 3.

RMI's complaint that, as a dealer/distributor, RMI will be disadvantaged in negotiating with ADOM, RMI's only approved supplier, does not state a valid basis of protest. The price a company is charged by its supplier is a private matter not for consideration by this Office. See Monarch Eng'g Co., B'218374, June 21, 1985, 85'1 CPD para. 709 at 6; Diesel Energy Sys. Co., B-213428.2, Jan. 13, 1984, 84-1 CPD para. 69 at 1. Moreover, an agency is not required to equalize a competitive advantage that a firm may enjoy--or a disadvantage it may experience--because of the firm's particular business circumstances, where that advantage or disadvantage does not result from a preference or unfair action by the government. See Missouri Machinery & Eng'g Co., B-403561, Nov. 18, 2010, 2010 CPD para. 276 at 5.

The protest is dismissed.

Moreover, there is no merit to RMI's complaint that the Air Force was required to approve RMI as a manufacturer because RMI retains control over design and manufacturing quality, and because the FAA, through its issuance of a PMA to RMI, recognizes RMI as a manufacturer of the part. See Comments, Part 6; RMI Post'Hearing Comments, Comment 2. The Air Force concluded as a result of its site visit to RMI's facility that RMI possesses no shop personnel, in-house shop processes, or other manufacturing facilities, and therefore cannot be approved as a manufacturer. DLA Post-Hearing Comments at 2. RMI does not dispute the Air Force's determination that RMI has no in-house manufacturing capability and admits that its subcontractors are responsible for actual production of the part. Protest at 5; see Audio Recording, File 3. Rather, RMI, without support, simply disagrees with the Air Force's conclusion with regard to its status as a manufacturer.

Lynn H. Gibson

General Counsel

This is a verbatim capture of GAO's own published decision. Nothing is summarized or reworded, and the sections run in the order GAO wrote them. One thing is moved: GAO collects its numbered notes at the foot of the document, and each is shown here under the paragraph that first cites it, with its own number carrying you back. A note the decision never cites stays where GAO printed it.

Related Decisions

Same Agency

Same Year

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.