No. 2021-1008

Asset Protection & Security Services, L.P. v. United States

Jul 19, 2021opinionAppeal from the Court of Federal Claims
AffirmedBid protestPrecedentialContractor appealed

Disposition

AFFIRMED

Affirmed. Read from the standalone disposition line the opinion closes on. The court left the decision below standing. That is a win for whoever prevailed below, which is the appellee.

Key Facts

Appellant
Asset Protection & Security Services
Appellee
United States, Akima Global Services LLC
Appeal taken by
Contractor appealed

The contractor or protester lost below and brought the appeal.

Docket number
No. 2021-1008
Decided
Jul 19, 2021

From the opinion's own decided line.

Matter
Bid protest
Panel
DYK, PROST, HUGHES
Opinion by
DYK

Appealed From

Court of Federal Claims1:20-cv-00449-MBH

The Article I trial court whose contract and bid protest judgments this court reviews under 28 U.S.C. 1295(a)(3).

Appeal from the United States Court of Federal Claims in No. 1:20-cv-00449-MBH, Senior Judge Marian Blank Horn

Counsel

For the appellant
DAVID THOMAS RALSTON
J R, Foley & Lardner LLP
Washington, DC
For the appellee
DANIEL B. VOLK
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
For the appellee
BRIAN MATTHEW BOYNTON
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
For the appellee
ROBERT EDWARD KIRSCHMAN
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
For the appellee
J R
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
Also appearing
MICKLE
For the appellee
CHE PETER DUNGAN
Miles & Stockbridge P.C
Wash- ington, DC
For the appellee
ROGER V
Miles & Stockbridge P.C
Wash- ington, DC
Opinion PDF (cafc.uscourts.gov)The disposition, the side that appealed and the appearances above are read deterministically from the opinion's own words. The court's document is the source of record.

Research This Decision

Create a free account to open this decision in the Federal Circuit workspace: the filtered browser over every appeal, the outcome dashboard, and the reading that follows an appeal down to the decision under review and across the cases it cites.

Browse with Filters

Every government-contracts appeal in the corpus, filtered by the tribunal below, the disposition, precedential status and matter, with full-text search over the opinions.

Insights

Contractor relief by disposition and by the side that appealed, per tribunal below and per year, with every denominator visible beside its rate.

Cross-Corpus Reading

The Appealed-from join into the Court of Federal Claims, ASBCA and CBCA corpora, and the cited-cases panel that names every prior decision this opinion relies on.

Full Opinion

Full text of the opinion9 pages, 16,611 characters, read from the court's own documentDecided Jul 19, 2021 on the opinion's own line Decision documentOfficial source: U.S. Court of Appeals for the Federal Circuit opinions and orders
PanelDYK, PROST, HUGHESOpinion byDYKPrecedentialAffirmed
Appealed fromUnited States Court of Federal Claims1:20-cv-00449-MBHJudge Marian Blank HornThe opinion states: Appeal from the United States Court of Federal Claims in No. 1:20-cv-00449-MBH, Senior Judge Marian Blank Horn
The opinion closes: AFFIRMED(the standalone disposition line)

Authorities cited

6 authorities read from this opinion's own text, grouped by the body of law each comes from. Select one to read it at its publisher.

Tucker Act and the Judicial Code2
Federal Acquisition Regulation4

Read from the opinion's own words with no model involved. Statutes, regulations, the acts these forums argue by name, and cases at the board, this office or the Comptroller General are recognized; any other citation form is left out rather than guessed at, so this is a floor on what the opinion cites.

Cases cited

16 cases this opinion cites, grouped by the forum that decided each, in the order it first names them. 15 of them open at a publisher; the rest are shown without a link because no published copy of them was confirmed.

9 more.

Read from the opinion's own words with no model involved: the party names and the citation are as the opinion prints them. A case cited to a reporter is not held here, so where it opens was confirmed one citation at a time against an outside database and is labelled as leaving this app; a citation that database could not place, or matched to more than one case, is shown without a link rather than guessed at. A case named without a citation of any kind carries nothing to read, so it is left out rather than guessed at, and this is a floor on what the opinion cites.

United States Court of Appeals

for the Federal Circuit

ASSET PROTECTION & SECURITY SERVICES, L.P.,

Plaintiff-Appellant

v.

UNITED STATES, AKIMA GLOBAL SERVICES, LLC,

Defendants-Appellees

2021-1008

Appeal from the United States Court of Federal Claims

in No. 1:20-cv-00449-MBH, Senior Judge Marian Blank

Horn.

Decided: July 19, 2021

The case caption as the opinion prints it. Every word is kept; only a line that is nothing but a drawn rule is left out.

For the appellant
DAVID THOMAS RALSTON
J R, Foley & Lardner LLP
Washington, DC
As the opinion writes it

DAVID THOMAS RALSTON, J R., Foley & Lardner LLP, Washington, DC, argued for plaintiff-appellant. Also rep- resented by JULIA D IVITO, FRANK S. MURRAY, GEORGE ELLSWORTH QUILLIN.

For the appellee
DANIEL B. VOLK
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
As the opinion writes it

DANIEL B. VOLK, Commercial Litigation Branch, Civil Division, United States Department of Justice, Washing- ton, DC, argued for defendant-appellee United States. Also represented by BRIAN MATTHEW BOYNTON, ROBERT EDWARD KIRSCHMAN, J R., DOUGLAS K.

BRIAN MATTHEW BOYNTON
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
As the opinion writes it

Also represented by BRIAN MATTHEW BOYNTON.

ROBERT EDWARD KIRSCHMAN
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
As the opinion writes it

Also represented by ROBERT EDWARD KIRSCHMAN.

J R
Commercial Litigation Branch, Civil Division, United States Department of Justice
Washing- ton, DC
As the opinion writes it

Also represented by J R.

CHE PETER DUNGAN
Miles & Stockbridge P.C
Wash- ington, DC
As the opinion writes it

CHE PETER DUNGAN, Miles & Stockbridge P.C., Wash- ington, DC, argued for defendant-appellee Akima Global Services, LLC. Also represented by ROGER V. ABBOTT; ALFRED WURGLITZ, Rockville, MD.

ROGER V
Miles & Stockbridge P.C
Wash- ington, DC
As the opinion writes it

Also represented by ROGER V.

Other appearances
MICKLE
As the opinion writes it

MICKLE.

D AVID T HOMAS RALSTON, J R., Foley & Lardner LLP, Washington, DC, argued for plaintiff-appellant. Also represented by J ULIA D I VITO, F RANK S. M URRAY , G EORGE ELLSWORTH Q UILLIN.

D ANIEL B. VOLK, Commercial Litigation Branch, Civil Division, United States Department of Justice, Washington, DC, argued for defendant-appellee United States. Also represented by BRIAN MATTHEW BOYNTON, R OBERT EDWARD K IRSCHMAN, J R., D OUGLAS K. MICKLE.

CHE P ETER D UNGAN, Miles & Stockbridge P.C., Washington, DC, argued for defendant-appellee Akima Global Services, LLC. Also represented by ROGER V. ABBOTT ; ALFRED WURGLITZ, Rockville, MD.

Before DYK, PROST*, and HUGHES, Circuit Judges.

DYK, Circuit Judge.

The U.S. Immigration and Customs Enforcement (ICE) awarded a contract to Akima Global Services, LLC to provide services at one of ICE’s detention facilities in Arizona. Asset Protection and Security Services, L.P., an unsuccessful bidder, brought a bid protest action in the Court of Federal Claims (“Claims Court”), challenging the award. The Claims Court held that Asset was without standing to challenge the award. We affirm.

BACKGROUND

The pertinent facts are not in dispute. In 2016, ICE issued a solicitation for a contractor to provide detention, food, and transportation services at its Florence Detention Center in Arizona. Asset was the incumbent contractor. The solicitation went through various modifications and amendments and provided several evaluation factors. Under the original solicitation, ICE indicated that proposals would “be evaluated for price realism, completeness, and reasonableness.” J.A. 430.

While this version of the solicitation was pending, ICE received a question from a prospective offeror asking, “Arizona charges 4.5% ‘business tax’; will the Federal Government issue a tax exemption certificate to the successful * Circuit Judge Sharon Prost vacated the position of Chief Judge on May 21, 2021.

offeror?” Id. at 528. ICE responded, “Yes.” Id. Given ICE’s answer, Asset’s initial proposal included an explanation of the cost estimates factored into its pricing, stating that “[s]ales taxes were not charged due to the government’s expressed intent to provide Team Asset with a tax-exempt certificate, where applicable.” Id. at 2022.

Ultimately, ICE selected Akima for the contract award because the government determined that it offered the best value. Asset filed a bid protest with the Government Accountability Office (GAO). Rather than proceed with the bid protest, ICE decided to take voluntary corrective action.

ICE then issued Amendment 17, which made several changes to the solicitation, and required offerors to supply ICE with specific pricing information in their proposals. Amendment 17 also changed the way that ICE was to analyze prospective offerors’ pricing. Rather than evaluate proposals for price realism as well as reasonableness, ICE required offerors to submit a firm fixed price proposal and explained that it would “assess the reasonableness of the proposed prices” and “conduct its price analysis using one or more of the techniques specified in FAR 15.404-1(b).” Id. at 779. These techniques include the “[c]omparison of proposed prices received in response to the solicitation,” 48 C.F.R. § 15.404-1(b)(2)(i), and the “[c]omparison of proposed prices to historical prices paid, whether by the Government or other than the Government, for the same or similar items,” id. § 15.404-1(b)(2)(ii), among other techniques, see id. § 15.404-1(b)(2)(iii)–(vii) (outlining other price analysis techniques). In other words, ICE would determine whether the prices were not unreasonably high (reasonable) but would not determine whether they were unreasonably low (price realism). Asset submitted its updated proposal on May 30, 2019.

See also 48 C.F.R. § 15.404-1(b)(3) (explaining that “[t]he first two techniques at 15-404-1(b)(2) are the preferred techniques”).

After discussions with offerors, ICE issued Solicitation Amendment 19 on May 31, 2019. In this Amendment, ICE corrected its earlier response to the tax-exempt status question. ICE clarified that it “CANNOT delegate its tax exempt status to contractors for the performance of government services.” J.A. 1281. In light of this change, ICE instructed that offerors “review their price proposals and provide their best and final prices.” Id.

Asset’s Vice President for Contract Administration & Business Development, Ron Gates, responded to the Amendment the same day and stated that he had “reviewed, signed and attached Amendment 19 hereto. Asset’s proposal does not require further revision.” Id. at 1278. Asset did not remove the tax-exempt certificate language from its proposal despite receipt of this Amendment. ICE again clarified the tax-exempt status question via Amendment 20, which issued on June 4, 2019, adding the word “no” to its response. Id. at 1285 (“No, the Government CANNOT delegate its tax exempt status to contractors for the performance of government services.” (emphasis added)). In the amendment, the government again instructed that offerors “review their price proposals and provide their best and final prices.” Id.

Mr. Gates again responded to the Amendment on behalf of Asset, stating that “Asset has reviewed it [sic] price proposal in response to Amendment 20. No changes are deemed necessary. I have attached a signed copy of Amendment 20 herewith.” Id. at 1282. The tax-exempt certificate language remained in Asset’s proposal.

Thereafter, ICE again selected Akima for the contract award. Asset again filed a protest with the GAO,

challenging ICE’s evaluation of its proposal under the factors outlined in the solicitation and challenging ICE’s best-value analysis. ICE again decided that it was best to take corrective action on its own by reevaluating the proposals and making a new source selection and requested that the GAO dismiss the protests, which the GAO did.

On reevaluation, ICE once again selected Akima for the contract award. The government utilized FAR 15.404-1(b)(2)(i) in its price analysis, comparing the prices proposed by the bidders. ICE concluded that Asset was ineligible to receive the contract award because Asset’s proposal included the tax-exempt certificate language, rendering it a contingent price. In response, Asset filed another bid protest at the GAO, arguing that ICE improperly concluded that its bid contained contingency pricing and again disputing ICE’s best-value analysis. This bid protest went forward. The GAO agreed that ICE improperly determined that Asset’s bid contained contingency pricing but concluded that Asset “was not prejudiced by the agency’s error,” finding ICE’s best-value analysis “to be reasonable,” J.A. 1469, and denying Asset’s protest.

Asset then filed a bid protest complaint at the Claims Court. The government and Akima (the successful bidder) argued that Asset lacked standing to bring the bid protest. The Claims Court “determined that Asset’s price proposal . . . was non-responsive to the requirements of the Solicitation, as explicitly amended more than once, and, therefore, . . . Asset’s price proposal was non-compl[ia]nt,” making it ineligible for the contract award. J.A. 35. Because Asset submitted a non-responsive bid, the Claims Court held that Asset “lack[ed] standing to bring the . . . protest.” Id. at 36. Asset appeals. We have jurisdiction under 28 U.S.C.

§ 1295(a)(3).

DISCUSSION

We review standing determinations de novo and any underlying factual findings for clear error. CliniComp Int’l, Inc. v. United States, 904 F.3d 1353, 1357 (Fed. Cir. 2018).

The Claims Court, while an Article I court, “applies the same [constitutional] standing requirements enforced by other federal courts created under Article III.” Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1359 (Fed. Cir. 2009) (quoting Anderson v. United States, 344 F.3d 1343, 1350 n.1 (Fed. Cir. 2003)). The standing issue in this case, however, is framed by 28 U.S.C. § 1491(b)(1), which provides the Claims Court’s jurisdiction over bid protests. We have explained that § 1491(b)(1) “imposes more stringent standing requirements than Article III.” Weeks Marine, 575 F.3d at 1359.

Section 1491(b)(1) requires a protestor to make two showings to establish standing: “First, it must show that it is an ‘interested party,’” which “requires the plaintiff to show that it is ‘an actual or prospective bidder’ and has a ‘direct economic interest’ in the procurement or proposed procurement.” CliniComp, 904 F.3d at 1358 (quoting Diaz v. United States, 853 F.3d 1355, 1358 (Fed. Cir. 2017)).

Section 1491(b)(1) grants the Claim’s Court jurisdiction over an action by an interested party objecting to a solicitation by a Federal agency for bids or proposals for a proposed contract or to a proposed award or the award of a contract or an alleged violation of statute or regulation in connection with a procurement of a proposed procurement.

28 U.S.C. § 1491(b)(1).

“Second, the plaintiff must show that it was prejudiced by a significant error in the procurement process,” meaning that, “but for the error, it would have had a substantial chance of securing the contract.” CliniComp, 904 F.3d at 1358 (emphasis in original) (first quoting Diaz, 853 F.3d at 1358; and then quoting Labatt Food Serv., Inc. v. United States, 577 F.3d 1375, 1378 (Fed. Cir. 2009)).

We conclude that Asset did not have a substantial chance of winning the contract because its proposal was not responsive to the solicitation, making it ineligible for the contract award. Asset’s bid included information that expressly contradicted the solicitation’s material terms. Thus, Asset was without standing to challenge ICE’s award of the contract to Akima.

Asset admits that its bid includes an error. ICE’s solicitation required bidders to “[e]xplain in detail all pricing and estimating techniques.” J.A. 779. Asset’s description of its pricing, explaining that it was expecting the government to provide a tax-exempt certificate, was not consistent with the solicitation as amended. Asset essentially argues that this error was harmless. First, it argues that its bid price was unaffected by the error given that the solicitation, “through its firm fixed price requirement, established that an offeror’s firm fixed price proposal made an offeror responsible for all costs of contract performance, irrespective of whether or not the offeror factored a specific cost into its calculation of its firm fixed price.” Appellant’s Br. 28. Asset points out that a firm fixed price contract places “maximum risk and full responsibility for all costs and resulting profit or loss” on the offeror. Id. at 26 (quoting 48 C.F.R. § 16.202-1; then citing ITT Fed. Servs. Corp. v. Widnall, 132 F.3d 1448, 1451 (Fed. Cir. 1997)). Second, Asset contends that its bid did not set a contingent price. Third, Asset argues that the solicitation did not require a price-realism analysis. On appeal, the government does not appear to dispute any of these three points. Instead, it

argues that “Asset’s proposal was unacceptable on its face” and, as a result, could not have been selected and was ineligible for award of the contract. Appellee’s Br. 9. Asset thus “lack[ed] standing to challenge the agency’s decision to award the contract to Akima.” Id.

Under our cases, “a proposal that fails to conform to the material terms and conditions of [a] solicitation should be considered unacceptable and a contract award based on such an unacceptable proposal violates the procurement statutes and regulations.” Allied Tech. Grp. v. United States, 649 F.3d 1320, 1329 (Fed. Cir. 2011) (quoting E.W. Bliss Co. v. United States, 77 F.3d 445, 448 (Fed. Cir. 1996)). The government argues that compliance with the amendments relating to the unavailability of a tax-exempt certificate constituted a material term of the solicitation because, absent compliance, there would be a significant ambiguity in the terms of any purported agreement. We agree. Given the mismatch between the terms of ICE’s solicitation and Asset’s bid, any agreement formed would fail to “satisfy the requirement of reasonable certainty applicable to the essential terms of all contracts.” Pac. Gas & Elec. Co. v. United States, 838 F.3d 1341, 1355–56 (Fed. Cir. 2016); see also United Pac. Ins. Co. v. Roche, 401 F.3d 1362, 1366 (Fed. Cir. 2005) (“In the absence of . . . sufficiently definite terms, no contractual obligations arise.” (quoting Modern Sys. Tech. Corp. v. United States, 979 F.2d 200, 202 (Fed. Cir. 1992))).

This ambiguity was significant. If ICE had selected Asset’s bid, that would have created a risk of future litigation on the theory that the government knew of the error in Asset’s bid and did not require its correction. “[I]n limited circumstances,” “if the government has knowledge, or constructive knowledge, that a contractor’s bid is based on a mistake, and the government accepts the bid and awards the contract despite knowledge of this mistake, then a trial court may reform or rescind the contract.” Giesler v. United

States, 232 F.3d 864, 869 (Fed. Cir. 2000) (citing United States v. Hamilton Enters., Inc., 711 F.2d 1038, 1046 (Fed. Cir. 1983)); see also Hunt Constr. Grp. v. United States, 281 F.3d 1369, 1376 (Fed. Cir. 2002) (explaining that, in certain circumstances, “[w]hen the government has notice of a mistake in a particular bid,” “fairness and good faith dealing” prevents “the government from knowingly awarding a contract to a bidder whose bid contained a mistake of which the government was aware”). “Such relief may be appropriate to prevent the government from overreaching when it knows the contractor has made a significant mistake during the bidding process.” Giesler, 232 F.3d at 869. The remedy, however, is not available for an “errant bid” caused by a bidder’s “gross negligence in failing to read and consider the specifications thoroughly.” Liebherr Crane Corp. v. United States, 810 F.2d 1153, 1157 (Fed. Cir. 1987). Although such a claim of government liability in the circumstances of this case could not have succeeded because Asset could not plausibly claim that it misread the amended solicitation, the government has a substantial interest in not creating opportunities for litigation based on an erroneous bid and was not obligated to accept a bid that was contrary to the amended terms of its solicitation. While ICE could have exercised its discretion to conduct another round of discussions with the prospective bidders to permit Asset to cure the error in its bid, ICE was under no obligation to do so. See JWK Int’l Corp. v. United States, 279 F.3d 985, 988 (Fed. Cir. 2002) (“[W]hether discussions should be conducted lies within the discretion of the contracting officer.” (citing 48 C.F.R. § 15.306(d)(3))). Thus, because of the error in Asset’s bid, Asset was an ineligible bidder, did not have a substantial chance of winning the ICE contract, and was without standing to challenge ICE’s award of the contract to Akima.

AFFIRMED

This is a verbatim capture of the text layer of the court's own document in Asset Protection & Security Services, L.P. v. United States. Nothing is summarized or reworded, and the sections run in the order the court wrote them. One thing the page shows is not repeated in the text: the pagination furniture, which is the page numbers, the docket footer and the electronic filing stamp printed across the top of each page.

Related Decisions

Appeals From the Court of Federal Claims

Also Affirmed

Same Year

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.