CBCA 2806

CMEC/ARC Electric JV, LLC

Dec 18, 2013Judge VergilioDEPARTMENT OF VETERANS AFFAIRS
Not published in the listingDenied

Key Facts

Appellant
CMEC/ARC Electric JV, LLC
Respondent agency
DEPARTMENT OF VETERANS AFFAIRS
Judge
Vergilio
Case number
CBCA 2806
Decided
Dec 18, 2013The decision states Dec 18, 2013 on its own face, which agrees with the listing.
Decision type
Not published in the listingThe Board's year tables for 2007 through 2014 carry no Type column, so no disposition was published for this decision. It is not missing data and nothing is inferred from the document.
Law firm for the appellant
Campbell & Bissell, PLLC
Outcome
Denied
The Board grants the agency's motion for summary relief and DENIES the appeal.
Read from the shouted disposition line the Board prints above this decision's own date, and quoted from its operative sentence above. No model is involved.

Topics

Changes and equitable adjustmentJurisdiction and timeliness

Topics are derived from each decision's own text by keyword rules, not a classification by the Board. A decision matching several topics carries all of them, so topic counts sum above the number of decisions. They are ordered strongest first.

Appearances

For the appellant
Erik H. Thorleifson and Michael S. Bissell
Campbell & Bissell, PLLC
Spokane, WA
For the respondent
David G. Fagan
Office of Regional Counsel, Department of Veterans Affairs
Portland, OR
Decision PDF (cbca.gov) Civilian Board of Contract Appeals, Contract Disputes Act casesThe Board's year listing this row was read fromThe decision document is hosted by the Board itself, so it is an official copy, and the Board's own Contract Disputes Act case listing is the citable source. The topics, the disposition and the appearances above are read deterministically from the decision's own words; no model is involved.

Research This Decision

Create a free account to open this decision in the CBCA workspace: a grounded decision brief drafted from the Board's own words, the Insights dashboard over the whole corpus, and the filtered browser.

CBCA Decision Brief

A Workflows Hub brief on this decision, drafted from the captured text with every quote and authority checked against it.

Insights

Who prevails before the Board, by topic and by judge, with every denominator visible: merits rulings, not decisions.

Browse with Filters

The whole corpus by year, decision type, topic, judge and disposition, searchable across the decisions' own text.

Full Decision

Full text of the decision4 pages, 7,189 characters, read from the Board's own documentDecided Dec 18, 2013 on its own faceRespondent DEPARTMENT OF VETERANS AFFAIRS Decision documentOfficial source: Civilian Board of Contract Appeals, Contract Disputes Act cases

DENIED: December 18, 2013

CBCA 2806

CMEC/ARC ELECTRIC JV, LLC,

Appellant,

v.

DEPARTMENT OF VETERANS AFFAIRS,

Respondent.

The case caption as the decision prints it. Every word is kept; the rule the Board draws around it is not text, so it is not repeated here.

Erik H. Thorleifson and Michael S. Bissell of Campbell & Bissell, PLLC, Spokane, WA, counsel for Appellant.

David G. Fagan, Office of Regional Counsel, Department of Veterans Affairs, Portland, OR, counsel for Respondent.

Before Board Judges HYATT, VERGILIO, and DRUMMOND.

VERGILIO, Board Judge.

On April 4, 2012, the Board received a notice of appeal from CMEC/ARC Electric JV, LLC (contractor) concerning its contract with the Department of Veterans Affairs (VA or agency). The contractor installed generators and provided ancillary work at an agency facility. The contract required that controls for the new system work with the existing system with one database. The contractor disputes the determination by the contracting officer that the agency would not pay the contractor additional money to comply with the contract requirement.

The agency has moved for summary relief. The material facts are not disputed. The contractor is not entitled to additional payment; the agency required no more than compliance with the requirements of the contract. Accordingly, the Board grants the motion for summary relief submitted by the agency and denies the contractor’s claim.

Findings of Fact

1. Under contract VA260-RA-0817, the contractor was to replace and upgrade generators, and do ancillary work, at the Spokane VA Medical Center. Contract at 1, 5, 6; Uncontested Facts 1. This dispute involves but a portion of the overall work.

2. The solicitation and contract contained specifications regarding the direct digital control system for the heating, ventilation, and air conditioning (HVAC) system. Regarding the existing system and the new system, a requirement stated: New system including interface to existing systems and equipment shall operate and function as one complete system including one database of control point objects and global control logic capabilities. Facility operators shall have complete operations and control capability over all systems, new and existing including[:] monitoring, trending, graphing, scheduling, alarm management, global point sharing, global strategy deployment, graphical operations interface and custom reporting as specified.

Contract at 23 09 23 7T-1 (¶¶ 1.1.A, D), -4 (¶ 1.3.Q); Uncontested Facts 3.

3. Only after award did the contractor identify its intended system--a solution that would utilize a database separate from the existing, installed database. The agency rejected the system as non-compliant with the contract requirements. The contractor viewed the agency’s interpretation of the contract as flawed, because in its view the requirement for a single database amounted to a sole-source requirement for the controls. Uncontested Facts 3, 4, 5.

4. The contractor submitted a request for an equitable adjustment, seeking $129,699, said to be its additional costs of providing a system that met the agency’s interpretation of the contract. The contractor based its request upon its belief that the agency interpreted the contract to create a sole-source requirement. The contractor alleged that only a single source was capable of satisfying the requirement for one database. The contractor maintained that it was entitled to relief because of a defective specification, a constructive change, and/or because of the agency’s failure to disclose its superior knowledge.

Uncontested Facts 7; Request for Equitable Adjustment (Feb. 25, 2011). In the request for an equitable adjustment, the contractor contended that it reasonably believed that the existing controls system was an “open” system, such that the end user could competitively bid controls, and states that it “was not originally aware that [its proposed] controls would have to run off a separate database from existing [manufacturer-]installed database[.]” Request for Equitable Adjustment at 3.

5. The contracting officer denied the request and notified the contractor of its appeal rights. The contractor filed this appeal at the same time it submitted a certified claim to the contracting officer reiterating what was in its request for an equitable adjustment (a submission that lacked certification). The contracting officer denied the claim. Uncontested Facts 8-11. The contractor here appeals from that denial.

Discussion

The contractor contends that the agency improperly created a sole source procurement, as the contractor seeks relief based upon theories of defective specifications, a constructive change, and the agency’s withholding of superior knowledge. The agency moves for summary relief, asserting that the undisputed terms of the contract required the contractor to provide a system that encompassed only one database, not the two proposed by the contractor in its solution. The contractor opposes the motion, as it states that there are material facts in dispute.

The contractor states that there is a genuine issue of fact as to whether the specification required a “single” database as asserted by the agency. Contractor’s Statement of Genuine Issues and Uncontested Facts at 2 (¶ 7). This statement does not create a genuine issue of fact. The language of the contract is not disputed. Interpretation of the contract is a legal matter. The contract is not ambiguous. The contract calls for a system with a single database. The solution proposed by the contractor did not satisfy that requirement. The agency acted within the terms and conditions of the contract in insisting that the contractor provide a system satisfying the requirement.

The contractor makes allegations regarding the sole-source nature of the single database language as interpreted by the agency, and seeks to demonstrate reliance upon its assumption that this was to be an open system procurement. These matters are not material to this post-award dispute. The contract required the contractor to provide a system that operates and functions with one database. The agency properly rejected the contractor’s proposed solution that failed to comply with the contract requirement.

Theories of relief raised by the contractor (defective specification, constructive change, and failure by the agency to disclose its superior knowledge) attempt to shift liability to the agency. For the purpose of resolving this motion, one can assume that the single database requirement in fact amounted to a sole-source requirement. The contractor did not dispute that term and condition. The contract required the contractor to provide a solution compliant with the contract requirements. The agency can enforce the requirement; its actions are not implicated in the administration and dispute stages of the procurement. The contractor did not object to the terms and conditions of the procurement. Post-award, its assertions regarding the sole-source nature of the requirements come too late. Appeals and protests are distinct.

Decision

The Board grants the agency’s motion for summary relief and DENIES the appeal. ______________________________

JOSEPH A. VERGILIO

Board Judge

We concur:

CATHERINE B. HYATT

Board Judge

JEROME M. DRUMMOND

Board Judge

This is a verbatim capture of the text layer of the Board's own document in CMEC/ARC Electric JV, LLC, CBCA 2806. Nothing is summarized or reworded, and the sections run in the order the Board wrote them. What the page shows and the text does not repeat is the pagination furniture: the page numbers and the rules the Board draws around its caption and under its signatures. The signatures are set back into the columns the Board prints them in, each judge under the name he or she signed, and the typed copy of that name the page carries beneath each signature is not repeated.

Related Decisions

Same Judge

Same Topic

Same Year

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.