No. 18-846

SVD Stars II, LLC v. United States

Jun 22, 2018U.S. Court of Federal Claims
Bid protestNo topicMotion denied

Key Facts

Plaintiff
SVD Stars II, LLC
Case number
No. 18-846The listing writes it as 18-846 C, which names every case in a consolidated group.
Decided
Jun 22, 2018
As the opinion prints it
No. 18-846C (BID PROTEST)

Official Record (govinfo)

Judge of record
Judge Elaine D. Kaplan
Nature of suit
Contract - (Post Award) Injunction (140)
Cause
civil

From U.S. court records published by the Government Publishing Office, matched to this decision only where the official record's issue date equals the decision date above. Open the official record.

Matter

Bid protest

Matter is contract dispute, bid protest, or both. For a decision read from the curated listing it is the listing's own arrangement; for a decision read from the court's own feed it is the court's Nature of Suit where the official record holds one, and otherwise what the opinion's own opening states. Where the official record is available, the court's own Nature of Suit appears beside it.

Topics

No topic

Topics are an editorial grouping of the decisions read from the curated listing, not a classification by the court. A decision listed under several topics carries all of them. Bid protests carry no topic at all, and neither does a decision read from the court's own feed: no grouping was published for them.

Appearances

For the United States
Holly A. Roth
United States Department of Justice
McLean, VA
For the United States
Matthew T. Schoonover
Koprince Law LLC
Lawrence, KS

Cross References in the Listing

Opinion PDF (uscourts.gov) U.S. Court of Federal Claims opinions and ordersThe opinion document is hosted by the U.S. Court of Federal Claims itself, so it is an official copy, and the court's own opinions page is the source of record. The outcome, topics and appearances above are derived deterministically from the court's record and the opinion's own text.

Research This Decision

Create a free account to open this decision in the COFC workspace: the Decision Brief workflow, the filtered browser and the outcome insights over the whole corpus.

COFC Decision Brief

A Workflows Hub brief drafted from this opinion's own text and the authorities it cites, with every citation traced back to the page it came from.

Browse and Insights

The court's opinions filtered by matter, topic, judge, outcome and year, with the outcome dashboard whose every rate divides by merits rulings.

Full Opinion

Full text of the opinion6 pages, 17,173 characters, read from the court's own document Decision documentOfficial source: U.S. Court of Federal Claims opinions and ordersThe document states: No. 18-846C (BID PROTEST)

Authorities cited

5 authorities read from this opinion's own text, grouped by the body of law each comes from. 4 open at a publisher or in this app; the rest are shown without a link because no published page for them was confirmed.

Other statutes1
31 U.S.C. § 1
Federal Acquisition Regulation1
GAO Bid Protest Regulations1

Read from the opinion's own words with no model involved. Statutes, regulations, the acts these forums argue by name, and cases at the board, this office or the Comptroller General are recognized; any other citation form is left out rather than guessed at, so this is a floor on what the opinion cites.

Cases cited

22 cases this opinion cites, grouped by the forum that decided each, in the order it first names them. 21 of them open at a publisher; the rest are shown without a link because no published copy of them was confirmed.

12 more.

Read from the opinion's own words with no model involved: the party names and the citation are as the opinion prints them. A case cited to a reporter is not held here, so where it opens was confirmed one citation at a time against an outside database and is labelled as leaving this app; a citation that database could not place, or matched to more than one case, is shown without a link rather than guessed at. A case named without a citation of any kind carries nothing to read, so it is left out rather than guessed at, and this is a floor on what the opinion cites.

In the United States Court of Federal Claims

No. 18-846C (BID PROTEST)

(Filed Under Seal: June 19, 2018 | Reissued June 22, 2018)*

SVD STARS II, LLC,

Plaintiff,

v.

THE UNITED STATES OF AMERICA,

Defendant,

and

22ND CENTURY TECHNOLOGIES, INC.,

Defendant-Intervenor.

Keywords: Bid Protest; Temporary

Restraining Order; Preliminary Injunction;

Competition in Contracting Act; De Facto

Override of Stay; 31 U.S.C. § 3553.

The case caption as the opinion prints it. The box the court draws around it is a rule rather than text, so it is not repeated here; every word is.

For the government
Holly A. Roth
United States Department of Justice
McLean, VA
As the opinion writes it

Holly A. Roth, Reed Smith LLP, McLean, VA, for Plaintiff, with whom were Lawrence Block, Stacey Forbes, and Jonathan Davey, Reed Smith LLP. Kara M. Westercamp, Civil Division, U.S. Department of Justice, for Defendant, with whom were Douglas K. Mickle, Assistant Director, Robert E. Kirschman, Jr., Director, and Chad A. Readler, Acting Assistant Attorney General. C. Clay Weisenberger, Counsel, U.S. Army Engineering & Support Center, Of Counsel.

Matthew T. Schoonover
Lawrence, KS
As the opinion writes it

Matthew T. Schoonover, Koprince Law LLC, Lawrence, KS, for Defendant-Intervenor.

Holly A. Roth, Reed Smith LLP, McLean, VA, for Plaintiff, with whom were Lawrence Block, Stacey Forbes, and Jonathan Davey, Reed Smith LLP.

Kara M. Westercamp, Civil Division, U.S. Department of Justice, for Defendant, with whom were Douglas K. Mickle, Assistant Director, Robert E. Kirschman, Jr., Director, and Chad A. Readler, Acting Assistant Attorney General. C. Clay Weisenberger, Counsel, U.S. Army Engineering & Support Center, Of Counsel.

Matthew T. Schoonover, Koprince Law LLC, Lawrence, KS, for Defendant-Intervenor.

Opinion and Order

KAPLAN, Judge.

In this bid protest, Plaintiff SVD Stars II, LLC (SVD) claims that the U.S. Army unlawfully overrode a CICA stay when it awarded a short-term task order to Defendant-Intervenor 22nd Century Technologies, Inc. (22nd Century). Under the task order, 22nd Century will perform certain information technology (IT) services during the pendency of a GAO protest, * This Opinion and Order was originally issued under seal, and the parties were given the opportunity to request redactions. Neither party requested redactions, and the Court is now reissuing the Opinion and Order in full.

also filed by SVD, which concerns a longer-term task order the Army recently awarded to 22nd Century. In this action, SVD claims that by awarding the short-term task order to 22nd Century, the Army effected a de facto override of the automatic stay that went into place when SVD protested the longer-term task order at GAO, and that the Army failed to comply with the statutory requirements for overriding the automatic stay.

Along with its complaint, SVD has filed a motion for emergency declaratory relief and/or a TRO and preliminary injunction. The government has filed an opposition to SVD’s motion. On June 15, 2018, the Court issued a brief order denying SVD’s motion for a TRO, noting that it would fully explain its reasoning in a subsequent opinion. In addition, and also for the reasons discussed below, SVD’s motion for a preliminary injunction is DENIED.

Background1

The U.S. General Services Administration (GSA) has implemented a government-wide contract vehicle through which agencies may rapidly procure IT and related services from section 8(a)-certified small businesses via task order. See Compl. ¶ 1, ECF No. 1. This contract vehicle is known as the 8(a) Stars II government-wide acquisition contract (Stars II GWAC). See id.

It is the Court’s understanding that a contractor wishing to receive task orders under the Stars II GWAC must first obtain a Stars II contract from GSA, after which it is placed into a “pool” of eligible contractors. See id. ¶ 9. Eligible contractors then compete for task orders as they are issued by procuring agencies. See id.

In this case, the procuring agency is the U.S. Army, which requires IT and Information Management (IM) services at the Fort Belvoir Community Hospital in Fort Belvoir, Virginia. See id. ¶ 12. SVD has been providing such services to the Army under a Stars II task order since July 2016. See id. At the status conference, counsel represented that the time period covered by SVD’s existing task order has expired. See Status Conf. at 3:03:30–40 p.m. (June 14, 2018). Anticipating the expiration of the legacy task order, the Army issued a new task order covering a somewhat different set of IT services. See Compl. ¶ 2; see also Status Conf. at 3:17:05–3:18:02 p.m.; CO’s Decl. ¶ 12. On or about May 25, 2018, the Army awarded this task order (hereinafter, the “May 25 task order”) to 22nd Century. See Compl. ¶ 2. On June 4, SVD filed a protest of the May 25 task order at GAO. Id. This filing “triggered the automatic stay of performance required under the Competition in Contracting Act (‘CICA’), 31 U.S.C.

The facts set forth below are based on the allegations in Plaintiff’s complaint and the representations made by counsel during a status conference held on June 14, 2018, as well as portions of the contracting officer’s (CO) declaration (ECF No. 14-1) that appear undisputed.

In particular, counsel for the government represented that under the legacy task order, SVD had been providing SharePoint services, but that SharePoint services are not included in the task orders at issue in this case. See Status Conf. at 3:17:05–3:18:02 p.m.; see also Decl. of Margaret

C. Maine (CO’s Decl.) ¶ 12.

§ 3553(d)(3).” Id.; see also CO’s Decl. ¶ 5 (stating that the CO “issued a stop work order” on the May 25 task order the day she received notice of the GAO protest).

About two weeks later, on June 12, an Army CO informed SVD that the Army had awarded a separate task order (hereinafter, the “June 12 task order”) to 22nd Century as a direct award. See Compl. ¶ 4. The purpose of the June 12 task order was to obtain the IT and IM services the Army requires while the GAO protest unfolds, since performance on the May 25 task order is stayed pursuant to CICA. See id.; CO’s Decl. ¶ 6. In other words, the June 12 task order is a “bridge contract” intended to last the duration of the GAO protest. See Compl. ¶ 19. SVD alleges that 22nd Century has “contacted various [of its] employees for employment” and that the CO has advised SVD that the “[g]overnment expects [that] SVD will coordinate with 22nd Century . . . on transition.” Id. ¶¶ 17–18 (quotation and alterations omitted).

In its complaint, SVD alleges that the June 12 task order constitutes a “de facto override of the CICA . . . stay” because “[b]ut for the period of performance and the dollar value, the [June 12] [t]ask [o]rder is for the same services as required under the [May 25] [t]ask [o]rder.” Id. ¶ 5. And it contends that the Army has “fail[ed] to make any finding as to the necessity of an override” and “fail[ed] to notify SVD or . . . the GAO of such an override,” as is required under CICA. Id. ¶ 6 (citing 31 U.S.C. § 3553(d)(3), 4 C.F.R. § 21.6, and FAR 33.104(c)(3), (d)). Based on these allegations, SVD filed a motion for emergency declaratory relief and/or a temporary restraining order and preliminary injunction along with its complaint. See Pl.’s Mot. for Emergency Declaratory Relief, TRO and/or Prelim. Inj. (Pl.’s Mot.), ECF No. 5.

Discussion3

I. Standards for Issuing a TRO and/or Preliminary Injunction

A temporary restraining order is an “extraordinary and drastic remedy . . . that should not be granted unless the movant, by a clear showing, carries the burden of persuasion.” Jones Automation, Inc. v. United States, 92 Fed. Cl. 368, 370 (2010) (quoting Mazurek v. Armstrong, 520 U.S. 968, 972 (1997)). Further, the standards for determining whether to grant a temporary restraining order and for granting a motion for a preliminary injunction are aligned. In either case, the moving party must demonstrate that: (1) it is likely to ultimately succeed on the merits of its claims; (2) it will be irreparably harmed without injunctive relief; (3) the balance of hardships tips in its favor; and (4) the public interest favors the grant of injunctive relief. Am. Signature, Inc. v. United States, 598 F.3d 816, 823 (Fed. Cir. 2010) (citing Winter v. Nat. Res. Def. Council, Inc., 555 U.S. 7, 19 (2008)); see also Erico Int’l Corp. v. Vutec Corp., 516 F.3d 1350, 1353–54 (Fed. Cir. 2008) (discussing injunctive relief in a patent context); FMC Corp. v. United States, 3 F.3d 424, 427 (Fed. Cir. 1993). “No single factor is determinative, and ‘the weakness of the showing regarding one factor may be overborne by the strength of the others.’” Contracting Consulting Eng’g LLC v. United States, 103 Fed. Cl. 706, 709 (2012) (quoting FMC Corp., 3 F.3d at 427). At the same time, “the absence of an adequate showing with regard to any one factor may be sufficient, given the weight or lack of it assigned the other factors, to justify . . . denial” of a preliminary injunction or temporary restraining order. See Chrysler Motors Corp. v. Auto Body Panels of Ohio, Inc., 908 F.2d 951, 953 (Fed. Cir. 1990).

“This Court has jurisdiction to review an agency decision to override an automatic stay.” PGBA, LLC v. United States, 60 Fed. Cl. 196, 202 n.9 (citing RAMCOR Servs. Group, Inc. v. United States, 185 F.3d 1286, 1291 (Fed. Cir. 1999)), affirmed, 389 F.3d 1219 (Fed. Cir. 2004).

II. Application to This Case

The Court concludes that emergency and/or preliminary injunctive relief is not warranted in this case. Most pertinently, SVD is not likely to succeed on the merits of its claim because the premise of its legal theory—that the June 12 task order constitutes a de facto override of the CICA stay—is flawed and unsupported. The remaining factors likewise do not break in SVD’s favor.

A. Chance of Success on the Merits

First, SVD has not shown that it is likely to succeed on the merits of its claim. This is so because an agency’s decision to obtain a bridge contract during a CICA stay does not ordinarily constitute the functional equivalent of a stay override. See Carahsoft Tech. Corp. v. United States, 86 Fed. Cl. 325, 346–47 (2009); Access Sys., Inc. v. United States, 84 Fed. Cl. 241, 243 (2008). Thus, a stay override may prejudice the protester with respect to the protested contract because by the time the GAO reviews the protest, it may have become “too costly to undo the contract and award the contract to a successful bid protester.” See Lear Siegler, Inc., Energy Prods. Div. v. Lehman, 842 F.2d 1102, 1111 (9th Cir. 1988), withdrawn in part, 893 F.2d 205 (9th Cir. 1989) (en banc); see also Carahsoft, 86 Fed. Cl. at 346–47 (observing that absent a stay, the procuring agency may be more likely to “disregard the [GAO’s] recommendations to cancel the challenged award”). In contrast, when the agency issues a bridge contract, the protester generally is not “prejudice[d] . . . in its protest . . . or in subsequently performing the work if it is successful in its protest,” because “if [the] plaintiff is successful at the GAO, the original contract, in its entirety, will still be available.” Access Systems, 84 Fed. Cl. at 243.

Access Systems presented facts nearly identical to those at issue here. In that case, an agency seeking IT services awarded a 120-day bridge contract to a contract awardee after a disappointed offeror protested the contract award at GAO. See id. at 242. After reviewing evidence provided by the CO, Judge Bruggink held that even though the bridge contract covered “identical information technology services involved in the original contract,” it did not work a de facto override of the CICA stay. Id. at 243. He so held because the bridge contract was “a separate, self-contained contract” whose “term [would] not lessen the amount of work” under the protested contract, and whose funding was likewise segregated from the protested contract’s funding. Id. As Judge Bruggink observed, “[c]ontracts may share the same subject matter and yet remain separate and distinct from one another.” Id. Given these differences, Judge Bruggink concluded that “the bridge contract d[id] not disturb the status quo with respect to the original contract,” and thus that “the character of the bridge contract [wa]s distinctly different from an override.” Id.

See also Carahsoft, 86 Fed. Cl. at 347 (observing that the Court of Federal Claims “has encouraged and approved bridge contract awards as an alternative to a formal override where the

SVD offers no persuasive rebuttal to the logic of Access Systems. Rather, the gravamen of its position appears to be that if an agency awards a bridge contract during a GAO protest, the status quo may only be preserved by awarding the bridge contract to the incumbent. See Pl.’s Mot. at 8–9; Status Conf. at 3:11:30–3:12:50 p.m. The CICA stay, however, is not intended to freeze an incumbent’s status while GAO processes a protest. Rather, the stay preserves the status quo with respect to the awarded contract, on the reasoning that—with the contract on hold as awarded but unperformed—the agency is more likely to heed GAO’s recommendations if GAO finds fault with the award. See Carahsoft, 86 Fed. Cl. at 347; Access Systems, 84 Fed. Cl. at 242.

In short, the direct award of the June 12 task order to 22nd Century does not share the relevant features of an override of the CICA stay with respect to the protested contract. It therefore cannot be considered the functional equivalent of an override, such that the Army would have needed to comply with CICA’s stay override requirements when issuing it.

Accordingly, SVD has not demonstrated that it is likely to succeed on the merits of this protest.

B. Irreparable Injury

The Court also is not persuaded that, absent a TRO or preliminary injunction, SVD “will suffer irreparable harm before a decision can be rendered on the merits.” See OAO Corp. v. United States, 49 Fed. Cl. 478, 480 (2001). SVD claims that 22nd Century’s performance of the June 12 task order “threatens SVD’s ability to maintain its highly skilled staff” and may cause it to “suffer competitive injury because 22nd Century will be able to obtain valuable experience performing under the Second Task Order, reducing SVD’s current competitive advantage.” Pl.’s Mot. at 10.

But the loss of personnel by an incumbent contractor generally does not constitute irreparable injury, especially when it appears likely that the contractor may re-hire those employees if it successfully re-competes for the contract. See, e.g., Munilla Constr. Mgmt., LLC v. United States, 130 Fed. Cl. 131, 137 (2016); Eskridge Research Corp. v. United States, 92 Fed. Cl. 88, 99 (2010) (stating that “the decision of [the incumbent-protester’s] employe[e]s to work for [the awardee] is not the kind of injury that constitutes irreparable harm”); Comput. Scis. Corp. v. United States, 51 Fed. Cl. 297, 323 n.91 (2002) (“[A] potential loss of employees is not an irreparable harm.”). Indeed, as Judge Lettow observed, were the loss of employees sufficient bridge contract . . . maintains the status quo during the pendency of the protest”); cf. Bannum Inc. v. United States, 121 Fed. Cl. 543, 550–51 (2015) (no de facto override where agency used existing contracts with contract awardee to meets its needs during GAO protest of a new contract for similar services).

E-Management Consultants, Inc. v. United States, 84 Fed. Cl. 1 (2008), which Plaintiff cited at the status conference, is not on point. In that case, the agency expressly overrode the stay. See id. at 2–3. Thus, the question in that case was whether the agency’s decision to override the stay was arbitrary and capricious while the question in this case is whether the agency overrode the stay at all. See id. at 6–7.

to establish irreparable injury, courts would have to “consider any incumbent contractor’s loss of a successor contract to be [an] irreparable harm.” PGBA, LLC, 60 Fed. Cl. at 221.

Further, SVD’s contention that its competitive advantage will be reduced is speculative and thus “does not demonstrate irreparable harm,” especially considering that to become eligible to compete for task orders on the Stars II GWAC in the first place, both SVD and 22nd Century had to demonstrate certain baseline competencies to the GSA. See Sierra Military Health Servs., Inc. v. United States, 58 Fed. Cl. 573, 582 (2003) (finding that any “incumbency advantage” would not “suffer to an irreparable level” where incumbent and awardee already had similar competencies). For these reasons, SVD’s claims of irreparable harm lack merit.

C. The Balance of Hardships and the Public Interest

The Court concludes that the final two factors also do not weigh in favor of granting injunctive relief. As noted, the extent to which SVD will suffer any hardship is speculative. On the other hand, the government has represented that extending SVD’s legacy task order or issuing a bridge contract to SVD during the GAO protest would be significantly more costly than awarding the bridge contract to 22nd Century, and could also result in duplicative payments for SharePoint support services. See Status Conf. at 3:06:45–3:07:55 p.m.; id. at 3:17:05–3:18:02 p.m.; CO’s Decl. ¶ 9. Further, as discussed, SVD has not shown that it is likely to succeed on the merits such that the public interest in the integrity of the contracting process would be impaired absent an injunction. These factors therefore do not favor the issuance of a TRO or preliminary injunction.

* * * * * * * * * * * * * * * * * * * * * * * * * * In summary, none of the factors indicate that emergency declaratory or preliminary injunctive relief should be entered in this case. Accordingly, SVD’s motion is DENIED.

Conclusion

For the reasons discussed above, SVD’s motion for emergency declaratory relief and/or a TRO and preliminary injunction is DENIED.

Further, by Friday, June 22, 2018, the parties shall jointly propose a schedule for any further proceedings in this case.

IT IS SO ORDERED.

s/ Elaine D. Kaplan

ELAINE D. KAPLAN

Judge

This is a verbatim capture of the text layer of the court's own document in SVD Stars II, LLC v. United States. Nothing is summarized or reworded, and the sections run in the order the court wrote them. Two things the page shows are not repeated in the text: the rule the court draws around its caption, and the pagination furniture (the page numbers and the electronic filing stamp printed across the top of each page).

Related Decisions

Same Matter: Bid protest

Same Year

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.