BILLIE O. STONE, DBA STOBIL ENTERPRISE,
Appellant
v.
SECRETARY OF THE AIR FORCE,
Appellee
2020-1233
Appeal from the Armed Services Board of Contract Ap-
peals in Nos. 61688, 61689, Administrative Judge Richard
Shackleford.
Decided: October 19, 2021
The case caption as the opinion prints it. Every word is kept; only a line that is nothing but a drawn rule is left out.
As the opinion writes it
GEOFFREY MARTIN LONG, Commercial Litigation Branch, Civil Division, United States Department of Jus- tice, Washington, DC, for appellee. Also represented by BRIAN M. BOYNTON, MARTIN F. HOCKEY, J R., PATRICIA M. MCCARTHY.
As the opinion writes it
Also represented by BRIAN M.
As the opinion writes it
BILLIE O. STONE, San Antonio, TX, pro se.
BILLIE O. STONE, San Antonio, TX, pro se.
G EOFFREY MARTIN L ONG, Commercial Litigation Branch, Civil Division, United States Department of Justice, Washington, DC, for appellee. Also represented by BRIAN M. B OYNTON, MARTIN F. HOCKEY , J R., P ATRICIA M. MCCARTHY .
Before NEWMAN, LOURIE, and O’MALLEY, Circuit Judges.
PER CURIAM.
Billie O. Stone appeals from the decision of the Armed Services Board of Contract Appeals (“the Board”) denying his monetary claim against the Department of the Air Force. Appeals of Stobil Enter., Nos. 61688, 61689, 2019 ASBCA LEXIS 19 (Jan. 18, 2019) (“Decision”). Stone’s claim against the Air Force stems from a dispute over a contract for the removal and replacement of a door. For the following reasons, we dismiss the appeal for lack of jurisdiction.
BACKGROUND
Stone d/b/a/ Stobil Enterprise specializes in door installations. In January 2018, the Air Force submitted a Request for Quotation (RFQ) for the removal and replacement of a door. SAppx 14. The RFQ’s Statement of Work (SOW) stated in relevant part:
PROJECT SCOPE: The contractor shall furnish all supervision, labor, transportation[,] materials, tools, incidentals, equipment, and Quality Assurance to remove existing Overhead Door and install new Overhead Door, hardware, and electric motors. . . .
PROJECT DESCRIPTION: The requirements of this project are but not limited to the following: Remove one (1) each steel overhead door and replace with new 25’ by 21’ heavy duty rolling overhead door with electric operators.
Id. at 30.
“SAppx” refers to the appendix attached to the government’s response brief.
Stone submitted a quote in response to the RFQ. Subsequently, the Air Force awarded Stone the contract. Id. at 20.
After inspecting the door, Stone sent an email to the Air Force contract specialist informing her that the drum, which assists in the door’s electrical operation, was damaged. Id. at 23. He wrote that he could replace the drum, but that it would add an additional cost to the existing contract. Id. The contract specialist responded that, under the SOW, Stone would need to replace the drum at no additional cost. Id. at 24. She pointed out that the SOW required removal and replacement of the door and a drum is “part of the electrical operation” of the door. Id.
Stone disagreed and submitted a claim to the contracting officer for $126,000. Id. at 28. The claim encompassed, among other things, costs for purchase of materials and “harm; undue hardship; and loss of credit standing with the [m]anufacturer for nonpayment of the supplied materials procured for the Government’s requirement.” Id. The contracting officer denied Stone’s claim. Id. at 38. Shortly thereafter, the Air Force terminated its contract with Stone because he failed to complete the task by the required date. Id. at 39.
Stone appealed to the Board pursuant to the Small Claims Procedure. 41 U.S.C. § 7106(b). The Board sustained the contracting officer’s denial of Stone’s monetary claim and termination of the contract. See Decision, 2019 ASBCA LEXIS 19, at *10–12. According to the Board, per the SOW, Stone should have replaced the drum at no additional cost. The Board acknowledged that the drum was not mentioned in the contract, but credited the government’s argument that it was industry practice to replace the drum when replacing the door. Id. The Board also denied Stone’s motion for reconsideration. Appeals of Stobil Enter., Nos. 61688, 61689, 2019 ASBCA LEXIS 211, at *7 (July 23, 2019).
DISCUSSION
Our jurisdiction to review decisions of the Board is limited. The Contract Disputes Act defines this court’s jurisdiction to entertain appeals from Board decisions adjudicated pursuant to the Small Claims Procedure. It provides that such decisions are “final and conclusive and may not be set aside except in cases of fraud.” 41 U.S.C. § 7106(b)(4); see also § 7107. To invoke this court’s jurisdiction to review the Board’s decision, an appellant must make a “non-frivolous allegation of fraud in the board proceedings.” Palmer v. Barram, 184 F.3d 1373, 1380 (Fed. Cir. 1999).
Stone alleges that the Board acted fraudulently in making its decision. According to Stone, the Board “violat[ed] . . . federal statute[s]” and “failed to execute proper review.” Appellant’s Br. 11, 13. The government responds that we lack jurisdiction over Stone’s appeal because he has failed to non-frivolously allege fraud. Specifically, the government contends that Stone’s fraud allegations are conclusory and unsupported.
We agree with the government that we lack jurisdiction over this appeal. Although Stone makes general allegations that the Board acted fraudulently in reaching its decision, he provides no specific evidence in support of those allegations. For example, Stone states that the Board “suppressed” evidence, but he provides no such examples. Appellant’s Br. 19. He also asserts that the Board misrepresented facts and was therefore deceptive, but again, he offers no actual evidence of deception. See id. at 14. At bottom, Stone’s arguments amount to a disagreement with the Board’s determination. Because Stone has failed to make a non-frivolous allegation of fraud, we do not have jurisdiction to review this appeal.
CONCLUSION
We have considered Stone’s remaining arguments but find them unpersuasive. For the foregoing reasons, we dismiss the appeal.
DISMISSED
Stone filed a motion for supplemental briefing, which we granted on March 29, 2021. ECF No. 35. Subsequently, Stone filed another motion, requesting that we vacate the March 29, 2021 order allowing the briefing. ECF No. 36. We deny Stone’s request.
This is a verbatim capture of the text layer of the court's own document in Billie O. Stone dba Stobil Enterprise v. Sec'y of the Air Force. Nothing is summarized or reworded, and the sections run in the order the court wrote them. One thing the page shows is not repeated in the text: the pagination furniture, which is the page numbers, the docket footer and the electronic filing stamp printed across the top of each page.