CBCA 7712

Framaco International Inc.

Sep 6, 2024Judge RussellDEPARTMENT OF STATE
DecisionDenied

Key Facts

Appellant
Framaco International Inc.
Respondent agency
DEPARTMENT OF STATE
Judge
Russell
Case number
CBCA 7712
Decided
Sep 6, 2024The decision states Sep 6, 2024 on its own face, which agrees with the listing.
Decision type
Decision
Law firm for the appellant
Bradley Arant Boult Cummings LLP, Gdanski Law PC
Outcome
Denied
For the foregoing reasons, the appeal is DENIED.
Read from the shouted disposition line the Board prints above this decision's own date, and quoted from its operative sentence above. No model is involved.

Topics

Differing site conditionsChanges and equitable adjustmentCosts and quantumDelay, suspension and accelerationProcedure and sanctions

Topics are derived from each decision's own text by keyword rules, not a classification by the Board. A decision matching several topics carries all of them, so topic counts sum above the number of decisions. They are ordered strongest first.

Appearances

For the appellant
Douglas L. Patin and Erik M. Coon
Bradley Arant Boult Cummings LLP
Washington, DC
For the appellant
Sam Z. Gdanski and Abraham S. Gdanski
Gdanski Law PC
Teaneck, NJ
For the respondent
Thomas D. Dinackus and Matthew S. Tilghman and Alexandra N. Wilson
Office of the Legal Adviser, Buildings and Acquisitions, Department of State
Washington, DC
Decision PDF (cbca.gov) Civilian Board of Contract Appeals, Contract Disputes Act casesThe Board's year listing this row was read fromThe decision document is hosted by the Board itself, so it is an official copy, and the Board's own Contract Disputes Act case listing is the citable source. The topics, the disposition and the appearances above are read deterministically from the decision's own words; no model is involved.

Research This Decision

Create a free account to open this decision in the CBCA workspace: a grounded decision brief drafted from the Board's own words, the Insights dashboard over the whole corpus, and the filtered browser.

CBCA Decision Brief

A Workflows Hub brief on this decision, drafted from the captured text with every quote and authority checked against it.

Insights

Who prevails before the Board, by topic and by judge, with every denominator visible: merits rulings, not decisions.

Browse with Filters

The whole corpus by year, decision type, topic, judge and disposition, searchable across the decisions' own text.

Full Decision

Full text of the decision5 pages, 9,456 characters, read from the Board's own documentDecided Sep 6, 2024 on its own faceRespondent DEPARTMENT OF STATE Decision documentOfficial source: Civilian Board of Contract Appeals, Contract Disputes Act cases

Authorities cited

1 authority read from this decision's own text, grouped by the body of law each comes from. Select one to read it at its publisher.

Agency FAR supplements1

Read from the decision's own words with no model involved. Statutes, regulations, the acts these forums argue by name, and cases at the board, this office or the Comptroller General are recognized; any other citation form is left out rather than guessed at, so this is a floor on what the decision cites.

Cases cited

1 case this decision cites, in the order it first names it. No published copy of any of them was confirmed, so each is shown without a link.

Cresswell v. United States173 F. Supp. 805(Ct. Cl. 1959)

Read from the decision's own words with no model involved: the party names and the citation are as the decision prints them. A case cited to a reporter is not held here, so where it opens was confirmed one citation at a time against an outside database and is labelled as leaving this app; a citation that database could not place, or matched to more than one case, is shown without a link rather than guessed at. A case named without a citation of any kind carries nothing to read, so it is left out rather than guessed at, and this is a floor on what the decision cites.

THIS OPINION WAS INITIALLY ISSUED UNDER PROTECTIVE ORDER AND

IS BEING PUBLICLY RELEASED IN ITS ENTIRETY ON SEPTEMBER 10, 2024

DENIED: September 6, 2024

CBCA 7712

FRAMACO INTERNATIONAL INC.,

Appellant,

v.

DEPARTMENT OF STATE,

Respondent.

Douglas L. Patin and Erik M. Coon of Bradley Arant Boult Cummings LLP,

Washington, DC; and Sam Z. Gdanski and Abraham S. Gdanski of Gdanski Law PC,

Teaneck, NJ, counsel for Appellant.

The case caption as the decision prints it. Every word is kept; the rule the Board draws around it is not text, so it is not repeated here.

Thomas D. Dinackus, Matthew S. Tilghman, and Alexandra N. Wilson, Office of the Legal Adviser, Buildings and Acquisitions, Department of State, Washington, DC, counsel for Respondent.

Before Board Judges BEARDSLEY (Chair), RUSSELL, and O’ROURKE.

RUSSELL, Board Judge.

Appellant, Framaco International Inc. (Framaco), has filed 131 cases with the Board (certain of which are consolidated) based on its contract with respondent, Department of State (State or agency), Bureau of Overseas Building Operations, to construct an embassy compound in Port Moresby, Papua New Guinea.

This decision is being issued in accordance with the Board’s order on further proceedings of October 19, 2023 (Order), which largely adopted the parties’ proposal to resolve approximately 100 of appellant’s non-consolidated appeals brought pursuant to Board Rule 53 (48 CFR 6101.53 (2023)), along with certain claims in four of its consolidated appeals that were not based on Government-caused delay. See Rule 53 (governing accelerated procedures, which are available at an appellant’s election but limited to appeals involving amounts in dispute of $100,000 or less); see also Rule 1(a) (“The Board may alter [its] procedures on its own initiative or on request of a party to promote the just, informal, expeditious, and inexpensive resolution of a case.”). The Order states that “[t]he presiding judge with the two members of the panel . . . will decide the following appeals for which the parties will submit briefing: CBCA 7508, 7512, 7513, 7549, 7561, 7572, 7573, 7625, 7695, 7712, 7847, and 7859 (‘Selected Appeals’).” The Order additionally states, “Decisions rendered by the panel will be in summary form either in writing or orally, if a hearing is held; will be final and conclusive; will not be set aside, except for fraud; and will not be precedential.”

As agreed to by the parties, quantum in the non-consolidated appeals and certain claims in four of Framaco’s consolidated appeals to which the Order applies will be decided based on a formula derived from any damage amounts awarded to Framaco in the Selected Appeals. In a subsequent joint response filed with the Board on March 19, 2024, the parties confirmed that the Order applies to the appeals described above.

In this appeal (CBCA 7712), Framaco seeks costs for landscaping work that it performed but which it alleges was outside the scope of the contract. For the reasons stated below, the appeal is denied.

Background

I. The Contract

In September 2015, State awarded Framaco a firm-fixed-price contract, initially valued at approximately $97 million, to construct the New Embassy Compound (NEC) in Port Moresby, Papua New Guinea. Appeal File, Exhibit 1 at DOS-PTMO-00982321.1 The project was originally designed in 2010 as a “Standard Secure mini-Compound” (SSmC) with a scope that included a lock-and-leave new office building, a perimeter security wall and fence, a main compound entry pavilion (MCAP), a service entry/utility building, and a support annex. Exhibit 2 at DOS-PTMO-00982414. Construction of the SSmC facility began in 2012, but in 2013, after forty percent of the project was completed, a future marine detachment was planned for Port Moresby and the embassy staffing requirement was increased. Id. State therefore descoped the work under the 2012 contract and closed out that contract. The project was redesigned under an expanded NEC, incorporating the completed portions of the SSmC project as well as surplus equipment and materials, where appropriate. Id. The redesigned project included the perimeter security wall and fence, the MCAP, a new service compound entry pavilion, a new four-story office building and annex, a marine service guard residence, a service entry/utility building, an enlarged support annex, and a new recreation facility. Id.

All exhibits are found in the appeal file, unless otherwise noted.

II. Applicable Contract Provisions

The contract’s statement of work provided that “CLIN 0005 - OPTION” was for “[l]andscaping outside of the perimeter wall along Poreporena Highway” and that, “[s]hould this CLIN not be elected[,] the alternate plan for this area provided in Attachment J.3.6 shall be provided.” Exhibit 2 at DOS-PTMO-00982416. However, CLIN 0005 contained a typo.

Attachment J.3.6 is a pricing document that does not mention landscaping. Exhibit 25. The document containing the drawings that set out the alternate plan for CLIN 0005 was attachment J.3.7.1. Exhibit 10. Before award, one potential bidder inquired about this discrepancy and asked for clarification. Exhibit 18 at DOS-PTMO-01400508. State responded that, if CLIN 0005 was not exercised, “the contractor shall be required to perform the scope shown in Attachment J-3-7-1 CLIN 003 and 005 Alternate Drawings on Sheets CMPD LI401A, LI402 and LP402A.” Id. (emphasis added); see also Exhibit 10 at DOS-PTMO-01038330 (index identifying CLINs with landscaping requirements, including 0005). In a separate response to another potential bidder, State again stressed that the contract required landscaping in the same area affected by CLIN 0005, even if the CLIN was not exercised. Exhibit 18 at DOS-PTMO-1400505.

III. The Parties’ Arguments

Framaco asserts that its interpretation – that the landscaping work it performed was out of scope – should prevail because the contract did not reference any alternate landscaping work to be performed if CLIN 0005 were not exercised and instead referenced a pricing document (attachment J.3.6). Appellant’s Opening Brief at 6. Framaco also argues that “the existing site conditions did not match the drawings” in attachment J.3.7.1, proving that the attachment was prepared only for CLIN 0005, which was not awarded. Id. at 5. For these reasons, Framaco submitted a claim for $99,999 for landscaping costs in this area.

State argues that its instruction to perform the alternate landscaping plan in attachment J.3.7.1 was not a constructive change because the contract stated that an alternate landscaping plan would be required should State not exercise CLIN 0005. State maintains that it clarified pre-award (1) that “J.3.6” was a typographical error and (2) that the alternate plans the contractor was required to use in the event that CLIN 0005 was not exercised were in attachment J.3.7.1. Respondent’s Initial Brief at 1-3. State also argues that Framaco has not met its burden of proof in arguing that there was a differing site condition or a constructive change regarding the site for the landscaping because Framaco (1) did not provide a proper analysis or evidence for whether a type I or type II differing site condition existed and (2) did not show an increase in its cost of performance between the contract requirements and its actual performance. Id. at 6-7.

Discussion

When the Government clarifies the contract’s requirements before award in response to offeror inquiries and the contractor does not object, the contractor is determined to have known, or should have known, about the clarification and is thus bound by it. See Cresswell v. United States, 173 F. Supp. 805, 811 (Ct. Cl. 1959) (“If one party to a contract knows the meaning that the other intended to convey by his words, then he is bound by that meaning. The same is true if he had reason to know what the other party intended.”).

We find that the contract’s requirements are clear. If State did not elect to exercise CLIN 0005, which described landscaping work, then Framaco was required to perform the alternate landscaping plan set out in attachment J.3.7.1. Although the contract erroneously cited attachment J.3.6 (a pricing document) instead of J.3.7.1, State repeatedly corrected this error, pre-award, in response to inquiries from potential offerors. We find that a reasonable contractor would have understood State’s clarification that attachment J.3.7.1 was the correct document and that the contract required landscaping per J.3.7.1 if State did not exercise CLIN 0005.

As for Framaco’s arguments regarding differing site conditions, Framaco has not offered an analysis of how a type I or type II differing site condition existed or how any such condition increased its costs of performing the landscaping. See, e.g., CI-Pond Solutions JV, LLC v. Department of Justice, CBCA 7233, 22-1 BCA ¶ 38,077, at 184,913 (explaining the elements required to prove type I and type II differing site conditions); see also Tucci & Sons, Inc. v. Department of Transportation, CBCA 4779, 16-1 BCA ¶ 36,258, at 176,886 (“The appropriate measure of damages for a differing site condition is the additional cost incurred by the contractor as a result of the differing site condition.”). Indeed, in arguing a “differing site condition,” Framaco focuses on issues related to scope of work rather than the physical condition of the site. Appellant’s Reply Brief at 5-6.

Decision

For the foregoing reasons, the appeal is DENIED. Beverly M. Russell

BEVERLY M. RUSSELL

Board Judge

We concur:

Erica S. Beardsley

Board Judge

Kathleen J. O’Rourke

Board Judge

This is a verbatim capture of the text layer of the Board's own document in Framaco International Inc., CBCA 7712. Nothing is summarized or reworded, and the sections run in the order the Board wrote them. What the page shows and the text does not repeat is the pagination furniture: the page numbers and the rules the Board draws around its caption and under its signatures. The signatures are set back into the columns the Board prints them in, each judge under the name he or she signed, and the typed copy of that name the page carries beneath each signature is not repeated.

Related Decisions

Same Judge

Same Topic

Same Year

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.