CBCA 2057-R

Power Wire Constructors

Oct 15, 2012Judge GoodmanDEPARTMENT OF ENERGY
Not published in the listingRuled on a motion

Key Facts

Appellant
Power Wire Constructors
Respondent agency
DEPARTMENT OF ENERGY
Judge
Goodman
Case number
CBCA 2057-R
Decided
Oct 15, 2012The decision states Oct 15, 2012 on its own face, which agrees with the listing.
Decision type
Not published in the listingThe Board's year tables for 2007 through 2014 carry no Type column, so no disposition was published for this decision. It is not missing data and nothing is inferred from the document.
Law firm for the appellant
Schmidt, Schroyer, Moreno, Lee & Bachand, P.C.
Outcome
Ruled on a motion
The MOTION FOR CLARIFICATION is GRANTED as stated herein.
Read from the shouted disposition line the Board prints above this decision's own date, and quoted from its operative sentence above. No model is involved.

Topics

Procedure and sanctions

Topics are derived from each decision's own text by keyword rules, not a classification by the Board. A decision matching several topics carries all of them, so topic counts sum above the number of decisions.

Appearances

For the appellant
Ronald G. Schmidt
Schmidt, Schroyer, Moreno, Lee & Bachand, P.C.
Rapid City, SD
For the respondent
Claire Douthit
Office of General Counsel, Department of Energy
Lakewood, CO
Decision PDF (cbca.gov) Civilian Board of Contract Appeals, Contract Disputes Act casesThe Board's year listing this row was read fromThe decision document is hosted by the Board itself, so it is an official copy, and the Board's own Contract Disputes Act case listing is the citable source. The topics, the disposition and the appearances above are read deterministically from the decision's own words; no model is involved.

Research This Decision

Create a free account to open this decision in the CBCA workspace: a grounded decision brief drafted from the Board's own words, the Insights dashboard over the whole corpus, and the filtered browser.

CBCA Decision Brief

A Workflows Hub brief on this decision, drafted from the captured text with every quote and authority checked against it.

Insights

Who prevails before the Board, by topic and by judge, with every denominator visible: merits rulings, not decisions.

Browse with Filters

The whole corpus by year, decision type, topic, judge and disposition, searchable across the decisions' own text.

Full Decision

Full text of the decision5 pages, 7,763 characters, read from the Board's own documentDecided Oct 15, 2012 on its own faceRespondent DEPARTMENT OF ENERGY Decision documentOfficial source: Civilian Board of Contract Appeals, Contract Disputes Act cases

Authorities cited

1 authority read from this decision's own text, grouped by the body of law each comes from. Select one to read it at its publisher.

Contract Disputes Act1

Read from the decision's own words with no model involved. Statutes, regulations, the acts these forums argue by name, and cases at the board, this office or the Comptroller General are recognized; any other citation form is left out rather than guessed at, so this is a floor on what the decision cites.

MOTIONS FOR RECONSIDERATION DENIED;

MOTION FOR CLARIFICATION GRANTED: October 15, 2012

CBCA 2057-R

POWER WIRE CONSTRUCTORS,

Appellant,

v.

DEPARTMENT OF ENERGY,

Respondent.

The case caption as the decision prints it. Every word is kept; the rule the Board draws around it is not text, so it is not repeated here.

Ronald G. Schmidt of Schmidt, Schroyer, Moreno, Lee & Bachand, P.C., Rapid City, SD, counsel for Appellant.

Claire Douthit, Office of General Counsel, Department of Energy, Lakewood, CO, counsel for Respondent.

Before Board Judges DANIELS (Chairman), GOODMAN, and KULLBERG.

GOODMAN, Board Judge.

Appellant, Power Wire Constructors, has filed a motion for reconsideration and clarification of the Board’s decision dated August 30, 2012. Respondent has filed a response which includes information that we treat as a motion for reconsideration.

Appellant’s Motion for Reconsideration

The Board found that appellant’s stripping of a portion of proposed area 5 without respondent’s contractually-required prior approval and the destruction of a potentially 2 CBCA 2057-R

historical site within that area by tenants was justification for the state authority to bar appellant from further activity in the entire area. The Board found further that it was reasonable for respondent to concur with the state authority’s determination.

Appellant asserts in its motion for reconsideration that the Board overlooked facts that prove that respondent gave appellant prior approval for stripping proposed area 5. However, appellant asserted a contrary position in its response to respondent’s motion for summary relief:

The primary reason the DOE [Department of Energy] shut down PW [Power Wire Constructors] on the morning of September 24 was its commencement of “stripping” without the prior approval of DOE. The undisputed evidence discloses that there was never any contractual requirement for PW to seek the DOE’s prior approval for stripping activities. The contract clearly and unambiguously distinguishes “stripping” activities and “excavation” activities within a borrow area. (emphasis added)

Appellant’s Brief in Support of Its Motion for Summary Relief and in Opposition to Respondent’s Motion for Summary Relief at 18-19.

It is Power Wire’s position that “stripping” and “excavating” are separate and distinct and that no authorization or approval is required by DOE for stripping as a matter of law. . . . The only work that PW had done in Borrow Area 5 was strip for which it did not need approval.

Appellant’s Response to Respondent’s Statement of Undisputed Facts 38, 41 (emphasis added).

Thus, while appellant previously asserted that it had stripped a portion of proposed area 5 without prior approval and that prior approval was not required, appellant now asserts in its motion for reconsideration that it had received approval for stripping. A motion for reconsideration is not a vehicle that allows a party to retry a case or reinterpret evidence. Ryll International, LLC v. Department of Transportation, CBCA 1143-R, 12-1 BCA ¶ 35,029. Appellant also asserts in its motion for reconsideration that it should have been allowed to use that part of proposed area 5 that was undisturbed and allegedly did not contain any historical material. These arguments were previously raised by appellant and considered by the Board in reaching its decision. The Board noted that proposed area 5 contained two contiguous areas of approximately eight acres each, Power Wire Constructors v. Department of Energy, CBCA 2057, slip op. at 4 (Aug. 30, 2012), and that appellant maintained it could 3 CBCA 2057-R

have still been allowed to remove borrow material as the destruction of the site by the tenants of the property was minimal compared to the overall area, id. at 8. The operative undisputed facts were that approximately half the area was stripped prematurely by appellant and a potential historical site was destroyed by the tenants that were farming the area. In light of these actions, appellant was barred by the state authority from using the entire area, including the remainder of the area which had not been disturbed, and respondent concurred with the state authority’s decision, in accordance with its obligations under the National Historic Preservation Act (NHPA).

We held:

The resolution of appellant’s claim does not require us to determine whether there was historical material in proposed area 5 and in the site that was destroyed. Rather, we must determine whether respondent’s determination, after proposed area 5 was stripped and the site destroyed, to preclude appellant from using proposed area 5 as a borrow area was a breach of contract. . . .

Based upon appellant’s stripping of proposed area 5 without approval, contrary to the contract, and the tenants’ deliberate destruction of a potential historical site, the SHPO decided to bar any further activity in proposed area 5. This decision was within the SHPO’s authority to determine, and there is no evidence that the decision was arbitrary or capricious. It was reasonable for respondent to concur with the SHPO’s decision. It was also reasonable for respondent to bar all construction activity within proposed area 5 pending its own investigation of the destruction of the site by the tenants and the possibility that historical material was scattered throughout the site. Such decision was neither arbitrary, capricious, nor an abuse of discretion.

Accordingly, respondent’s refusal to approve proposed area 5 as a source of borrow material was not a breach of contract. In so doing, respondent fulfilled its obligations pursuant to the NHPA.

Power Wire Constructors, slip op. at 5 n.5; 8.

Reconsideration is not granted when a party reargues facts and theories upon which the Board has previously ruled. Flathead Contractors, LLC v. Department of Agriculture, CBCA 118-R, 07-2 BCA ¶ 33,688.

Appellant has not stated grounds for reconsideration.

__________________________________

4 CBCA 2057-R

Appellant’s Motion for Clarification

Appellant requests clarification as to the interest to be paid on its claim for transformer oil processing granted by the Board. As noted in the decision, appellant’s claim on this issue was $41,706. Respondent admitted liability with regard to $15,000 of this claim. The amount in dispute was therefore $26,706.1 The Board’s decision was applicable to the disputed amount only. Power Wire Constructors, slip op. at 2 n.1. Appellant is entitled to interest on the claimed amount of $41,706 at the rate allowed by the Contract Disputes Act, from the date the claim was received by the contracting officer until the date paid. 41 U.S.C.A. § 7109 (Supp. IV 2011).

Appellant also requests clarification with regard to what it characterizes as an “award” in the amount of $43,000 for a contract modification which respondent has described in its statement of uncontested facts. According to respondent, the modification amount includes the contract balance owed and the $15,000 undisputed amount for transformer oil processing. While respondent appears to admit liability to pay the contract modification, the modification was not addressed in the appeal or the Board’s decision, and the Board did not “award” the $43,000 to appellant as appellant suggests.

Decision

The MOTIONS FOR RECONSIDERATION are DENIED. The MOTION FOR CLARIFICATION is GRANTED as stated herein.

ALLAN H. GOODMAN

Board Judge

1Responding to appellant’s motion for clarification, respondent submits calculations not previously submitted to show that the amount in dispute was $18,424. We treat respondent’s response as a motion for reconsideration. Reconsideration is not a vehicle for introducing arguments that could have been made previously. Ryll.

We concur:

STEPHEN M. DANIELS

Board Judge

H. CHUCK KULLBERG

Board Judge

This is a verbatim capture of the text layer of the Board's own document in Power Wire Constructors, CBCA 2057-R. Nothing is summarized or reworded, and the sections run in the order the Board wrote them. What the page shows and the text does not repeat is the pagination furniture: the page numbers and the rules the Board draws around its caption and under its signatures. The signatures are set back into the columns the Board prints them in, each judge under the name he or she signed, and the typed copy of that name the page carries beneath each signature is not repeated.

Related Decisions

Same Judge

Same Topic

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.