Electric Boat Corporation
Electric Boat Corporation moved to stay its appeal concerning a contract price-adjustment claim arising from an OSHA fire-watch regulation while it pursued Federal Circuit review of an earlier Board decision on the statute of limitations. The Board granted the stay because the parallel proceedings involved substantially similar facts, issues, witnesses, and damages considerations, and the requested duration was reasonable.
Material Facts
- The appeal concerns a claim for a contract price adjustment arising from a December 2004 OSHA regulation requiring a fire watch during hot work in the assembly of Virginia Class attack submarines.
- Electric Boat's prime contract contained clause H-30, allowing a price adjustment for certain changes in federal laws or regulations.
- The clause was initially omitted from the contractual provisions designated to flow down to Electric Boat's subcontractors, and the omission was later corrected by modification.
- Electric Boat sought both its own costs and Huntington Ingalls, Inc.'s costs in the denied claim.
- The Electric Boat and HII portions of the appeal arose from the same contract, OSHA regulatory change, claim, and contracting officer's final decision and involved similar damages issues.
- Electric Boat and HII shared two expert witnesses, and the Navy used the same expert for both portions of the appeal.
Parties
- Appellant
- Electric Boat Corporation
- Respondent Agency
- Department of the Navy
- Contract Number
- N00024-03-C-2101
Full Legal Analysis
Create a free account to read the complete grounded legal brief for this decision, including the holding, every issue the Board decided, quantum, verified citations, and the case's citation graph.
Holding & Legal Reasoning
The Board's holding, background, and procedural posture for this decision.
Issues Presented
Every issue the Board decided, with its determination, reasoning, and supporting authority.
Quantum & Recovery
The claimed, awarded, and net dollar amounts at issue, itemized where the record supports it.
Verified Authorities & Citations
Every cited FAR, DFARS, CAS, and case-law authority, cross-checked against the source text.
Practitioner Takeaways
Practical guidance for contractors and counsel, distilled from the Board's ruling.
Similar Cases
Related decisions surfaced by semantic search across the full analyzed corpus.
Citation Graph
An interactive graph of this case's cited authorities, judge, agency, and related decisions.
Related Decisions
Same Judge
- Bahadir Construction Engineering Contracting & Trading Inc. Co. and Impreza Costruzioni Giuseppe Maltauro S.p. A Joint VentureNo. 64038, 64336, 64428September 9, 2026
- Elbit Systems of America-Night Vision, LLCNo. 64450August 11, 2026
- Globe Trailer Manufacturing, Inc.No. 60979-EAJAJuly 30, 2026
- Bahadir Construction Engineering Contracting & Trading Inc. Co. and Impreza Costruzioni Giuseppe Maltauro S.p.A Joint VentureNo. 64038, 64336, 64428July 16, 2026
- Filanc-Orion, JVNo. 63730, 6388, 63928, 63979July 1, 2026
- IVA'AL Solutions, LLCNo. 63430June 4, 2026
Same Year
- Club Car, Inc.No. 61710December 30, 2019
- Universal Service Provider, LLCNo. 62021December 23, 2019
- Technica CorporationNo. 62160December 20, 2019
- AXXON International, LLCNo. 61224, 61268, 61625December 20, 2019
- Naseem Al-Oula CompanyNo. 61321, 61322, 61323, 61324, 61325, 61326December 20, 2019
- Ford Lumber & Building Supply, Inc.No. 61618December 18, 2019
Same Issue
- Africa Transport Logistics CompanyNo. 64120October 1, 2026
- Martin Brothers ConstructionNo. 63196, 63431September 30, 2026
- Vigor Marine, LLCNo. 63405September 24, 2026
- Hensel Phelps Construction CompanyNo. 64327September 14, 2026
- WSP USA Solutions Inc.No. 62674September 1, 2026
- Hensel Phelps Construction Co.No. 63316, 63397, 63398August 28, 2026