Marine Hydraulics International, LLC

August 6, 2026Judge McLish
Partially SustainedContract Changes / Constructive ChangesContract InterpretationEquitable Adjustment (REA)Delay / Disruption / SuspensionQuantum / Damages

Marine Hydraulics International, LLC appealed the denial of claims arising from Navy work on the USS Gunston Hall, asserting constructive changes involving freeboard blasting, stern-flap draft marks, and a controllable-pitch-propeller overheating incident. The Board sustained entitlement for freeboard rovers and cleanup services and CPP oil-cleanup costs, denied entitlement for draft-mark work and CPP-related delay, and remanded quantum.

Material Facts

  • The Navy awarded MHI a firm-fixed-price contract for repair and alterations aboard the USS Gunston Hall.
  • MHI subcontracted drydocking and much of the dry-dock work to CSI, which subcontracted some work to IMIA.
  • The contract required abrasive blasting to remove existing exterior coating and required containment to prevent grit from escaping the work area into the air or water.
  • Degraded freeboard plating was punctured during blasting, allowing grit to enter the ship’s interior.
  • IMIA provided rovers to identify hull breaches and personnel to clean grit from affected interior spaces while blasting continued.
  • The Navy issued RCC 539G for pricing of additional rover and cleanup personnel, and the contracting officer later voided the RCC.
  • The contract documents referenced by the stern-flap work item included requirements to reinstall draft marks and mandatory reference drawings.
  • The new stern flap covered the existing draft marks on the ship’s transom.
  • The port CPP oil distribution box operational test failed before an overheating incident involving sump heaters on which MHI had performed no work.
  • The overheating incident damaged sump-heater gaskets, resulting in oil leaks and repeated cleanup work.
  • The undocking occurred on March 12, 2020, and the Board determined that CPP overheating did not cause the undocking delay.
  • MHI’s certified claims included a draft-mark claim and a CPP-overheating claim with delay and extra-work components.

Parties

Appellant
Marine Hydraulics International, LLC
Respondent Agency
Navy
Contracting Agency
Navy
Contract Number
N00024-19-C-4450
Open Official Decision PDF (asbca.mil)AI-analyzed, grounded in the decision text. Verify against the official PDF before relying on it.

Full Legal Analysis

Create a free account to read the complete grounded legal brief for this decision, including the holding, every issue the Board decided, quantum, verified citations, and the case's citation graph.

Holding & Legal Reasoning

The Board's holding, background, and procedural posture for this decision.

Issues Presented

Every issue the Board decided, with its determination, reasoning, and supporting authority.

Quantum & Recovery

The claimed, awarded, and net dollar amounts at issue, itemized where the record supports it.

Verified Authorities & Citations

Every cited FAR, DFARS, CAS, and case-law authority, cross-checked against the source text.

Practitioner Takeaways

Practical guidance for contractors and counsel, distilled from the Board's ruling.

Similar Cases

Related decisions surfaced by semantic search across the full analyzed corpus.

Citation Graph

An interactive graph of this case's cited authorities, judge, agency, and related decisions.

Related Decisions

Same Judge

Same Year

Same Issue

Newsletter

New decisions every Monday

GovConDash Weekly lists the decisions GAO, the boards, the courts and SBA OHA released that week, alongside the FAR Overhaul deviations and proposed rules that reach every contractor. Free.

Free, weekly, and one click to unsubscribe. We send a confirmation email first. See our Privacy Policy.