CDM Constructors Inc.
CDM Constructors Inc. appealed for equitable adjustments related to contract changes and defective specifications in the construction of a water treatment plant. The Board denied the appeal regarding evaporation ponds but awarded adjustments for defective generator specifications.
Material Facts
- The Corps awarded Contract No. W912PL-12-C-0022 to CDM for the design and construction of a water treatment plant at Fort Irwin, California.
- The contract required CDM to provide '2 + 1 STANDBY' evaporation ponds.
- The relevant design used a 2.25 mgd average daily flow and a 0.8 evaporation coefficient for a water depth greater than three feet.
- The parties stipulated that CDM is entitled to a $318,684.46 equitable adjustment for the defective generator specifications.
- CDM incurred increased general conditions costs of $7,367.54 due to the increased complexity caused by the defective generator specifications.
Parties
- Appellant
- CDM Constructors Inc.
- Respondent Agency
- U.S. Army Engineer District, Los Angeles
- Contract Number
- Contract No. W912PL-12-C-0022
Full Legal Analysis
Create a free account to read the complete grounded legal brief for this decision, including the holding, every issue the Board decided, quantum, verified citations, and the case's citation graph.
Holding & Legal Reasoning
The Board's holding, background, and procedural posture for this decision.
Issues Presented
Every issue the Board decided, with its determination, reasoning, and supporting authority.
Quantum & Recovery
The claimed, awarded, and net dollar amounts at issue, itemized where the record supports it.
Verified Authorities & Citations
Every cited FAR, DFARS, CAS, and case-law authority, cross-checked against the source text.
Practitioner Takeaways
Practical guidance for contractors and counsel, distilled from the Board's ruling.
Similar Cases
Related decisions surfaced by semantic search across the full analyzed corpus.
Citation Graph
An interactive graph of this case's cited authorities, judge, agency, and related decisions.
Related Decisions
Same Judge
- Procal Electric, Inc.No. 63580-ADROctober 2, 2026
- VESEQU LLCNo. 64468August 21, 2026
- PDO Ahuska Joint Venture LLCNo. 64164July 13, 2026
- First Street Contractors, LLCNo. 64028June 10, 2026
- VESEQU LLCNo. 64468May 21, 2026
- First Street Contractors, LLCNo. 64028February 20, 2026
Same Year
- Sweet Star Logistic ServiceNo. 62082December 29, 2020
- Nan, Inc.No. 61472, 61482, 61500, 61509, 61514, 61523, 61555, 61569, 61705, 61726, 61727, 61728, 61821, 61822, 61823, 61963December 18, 2020
- Asahi General Trading & Cont. Co. W.L.L.No. 62445December 18, 2020
- Kautaq Construction Services, LLCNo. 62462-ADRDecember 18, 2020
- MAC Electric Inc.No. 62503December 18, 2020
- Parsons Government Services, Inc.No. 62112December 17, 2020
Same Issue
- Africa Transport Logistics CompanyNo. 64120October 1, 2026
- Huffman Construction, LLCNo. 62591, 62783September 30, 2026
- Scot Cardillo dba Engineers Tooling SupportNo. 61612September 22, 2026
- DCS CorporationNo. 64648September 22, 2026
- VAE, Inc.No. 64437, 64464, 64465September 9, 2026
- Hensel Phelps Construction Co.No. 63316, 63397, 63398August 28, 2026