PDO Ahuska Joint Venture LLC
PDO Ahuska Joint Venture LLC sought partial summary judgment concerning whether its firm-fixed-price roof-system contract required a membrane-manufacturer warranty covering 120-mph wind speeds. The Board sanctioned Ahuska by striking fictitious citations and supporting contentions, but granted Ahuska partial summary judgment after holding that the contract was latently ambiguous and therefore did not require that warranty coverage.
Material Facts
- The United States Army awarded Ahuska a firm-fixed-price contract for the design and construction of a replacement multi-ply weatherproof membranes modified bitumen roof system for Building 210 at the Detroit Arsenal.
- SOW § 2.4.1.14.5 stated that the new roof shall have a wind uplift resistance for 120 mph wind speed and included a 20-year no-dollar-limit roof-system materials and installation workmanship warranty.
- SOW § 2.4.1.14.33 required roof-system material and workmanship warranties meeting specified requirements and required revision or amendment to the standard membrane-manufacturer warranty as necessary to comply with those requirements.
- SOW § 2.4.1.14.35 required the warranty to address damage occurring under the normal climatic and environmental conditions of the facility but did not define that phrase or identify a particular wind speed.
- The contract incorporated FAR 52.215-8's order-of-precedence provision.
- The government approved Ahuska's 100% design using Firestone as the membrane manufacturer.
- Firestone's membrane system met the 120-mph wind-speed requirement, but its standard warranty covered wind speeds of only 90 mph.
- The government required Ahuska to use James Manville as the membrane manufacturer.
- Ahuska's motion cited five cases, four of which the Board determined were fictitious.
- Ahuska withdrew all citations in its motion except Alliance Roofing.
Parties
- Appellant
- PDO Ahuska Joint Venture LLC
- Respondent Agency
- United States Army
- Contracting Agency
- United States Army
- Contract Number
- W56HZV20CL857
Full Legal Analysis
Create a free account to read the complete grounded legal brief for this decision, including the holding, every issue the Board decided, quantum, verified citations, and the case's citation graph.
Holding & Legal Reasoning
The Board's holding, background, and procedural posture for this decision.
Issues Presented
Every issue the Board decided, with its determination, reasoning, and supporting authority.
Quantum & Recovery
The claimed, awarded, and net dollar amounts at issue, itemized where the record supports it.
Verified Authorities & Citations
Every cited FAR, DFARS, CAS, and case-law authority, cross-checked against the source text.
Practitioner Takeaways
Practical guidance for contractors and counsel, distilled from the Board's ruling.
Similar Cases
Related decisions surfaced by semantic search across the full analyzed corpus.
Citation Graph
An interactive graph of this case's cited authorities, judge, agency, and related decisions.
Related Decisions
Same Judge
- Procal Electric, Inc.No. 63580-ADROctober 2, 2026
- VESEQU LLCNo. 64468August 21, 2026
- First Street Contractors, LLCNo. 64028June 10, 2026
- VESEQU LLCNo. 64468May 21, 2026
- First Street Contractors, LLCNo. 64028February 20, 2026
- Watts Constructors, LLCNo. 63753January 15, 2026
Same Year
- Bodell Construction CompanyNo. 63517-ADR, 63850-ADROctober 2, 2026
- Procal Electric, Inc.No. 63580-ADROctober 2, 2026
- Africa Transport Logistics CompanyNo. 64120October 1, 2026
- Kearfott CorporationNo. 64328October 1, 2026
- Relyant Global, LLCNo. 64606October 1, 2026
- Relyant Global, LLCNo. 64651October 1, 2026
Same Issue
- Africa Transport Logistics CompanyNo. 64120October 1, 2026
- Huffman Construction, LLCNo. 62591, 62783September 30, 2026
- Martin Brothers ConstructionNo. 63196, 63431September 30, 2026
- Vigor Marine, LLCNo. 63405September 24, 2026
- US Military CorpNo. 64321September 24, 2026
- Scot Cardillo dba Engineers Tooling SupportNo. 61612September 22, 2026